Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019
Perhitungan Kebutuhan Beton Dan Tulangan Pada Bangunan Kondotel The Royal Paradise Dengan Menggunakan Aplikasi Tekla
Structures Calculation Of Concrete And Reinforcement Needs On The Royal Paradise Condotel Building Using Tekla Structure Application
Tugas Akhir, 019 / 2019 / KGEUndergraduate Theses from JBPTPPOLBAN / 2020-04-16 15:43:16
Oleh : Lanang Yulandoro Putu Sadewo - 151111015 & Rizki Dwi Prakasa - 161111024 (rizkidwiprakasa17@gmail.com)
Dibuat : 2020-04-16, dengan 4 file
Keyword : tekla, pemodelan, perencanaan anggaran biaya, perbandingan, volume material
Subjek : tekla, modelling, budget planning, comparison, material volume
Tugas akhir ini bertujuan untuk memodelkan proyek Kondotel The Royal Paradise Gegerkalong dengan menggunakan aplikasi Tekla Structures serta membandingkan volume material yang didapat dari proyek dengan volume material yang disusun ulang berdasarkan data hasil output dari aplikasi Tekla Structures. Metode yang digunakan dalam penyelesaian tugas akhir ini adalah dengan memodelkan terlebih dahulu gambar DED proyek dengan aplikasi Tekla Structures dari gambar dua dimensi CAD menjadi model tiga dimensi untuk kemudian diperoleh gambar Detailed Engineering Design (DED) dan volume material yang selanjutnya dimasukkan ke dalam RAB yang telah diperoleh sehingga menghasilkan RAB yang baru. Dari hasil tersebut, kemudian akan dibandingkan volume material RAB yang diperoleh dari proyek dengan volume material RAB yang telah dihitung kembali berdasarkan data hasil output aplikasi Tekla Structures sehingga dari hasil perbandingan tersebut akan diperoleh perbedaan volume material dari proyek tersebut. Kata Kunci: tekla, pemodelan, perencanaan anggaran biaya, perbandingan, volume material.
Deskripsi Alternatif :This final project aims to model The Royal Paradise Gegerkalong Condotel Project by using Tekla Structures application and comparing the cost budget plan obtained from the project with rearranged cost budget plan based on the output data from Tekla Structures application. The method used in completing this final project is to model it first with Tekla Structures application from two-dimensional images into three-dimensional models to obtain Detailed Engineering Design (DED) drawing and volume of material which are then included in the cost budget plan with the volume of material obtained from volume output data of Tekla Structure. From these result, then compared between the cost budget plan obtained from the project with the cost budget plan that has been recalculated with the volume of material derived from the output data of Tekla Structures application, so that the result of the comparison are obtained the difference of the project material volume. Keywords: tekla, modelling, budget planning, comparison, material volume.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Husnul Fikri, S.T., M.T.
Pembimbing 2: Yullianty Noorlaelasari, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 151111015 & 161111024.pdf
(1550345 bytes)
File : BAB 1 - 151111015 & 161111024.pdf
(188898 bytes)
File : BAB 2 - 151111015 & 161111024.pdf
(522419 bytes)
File : BAB 5 - 151111015 & 161111024.pdf
(173163 bytes)