Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Sipil > 2018

Analisis Kemampuan Drainase untuk Mengatasi Genangan di Jalan Jend. H Amir Machmud Kota Cimahi Provinsi Jawa Barat

Analysist of Drainage Capacity to Resolve Inundation Problem in Jend.H.Amir Machmud Street Cimahi City West Java Province

Tugas Akhir, 022 / 2018 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2020-01-20 11:12:45
Oleh : 151121042 - Fitra Ramdhan Arrizal - 151121059 - Reynaldy Putra Herlambang (fitraramdhan97@gmail.com)
Dibuat : 2020-01-20, dengan 4 file

Keyword : Drainage , Inundation, HEC-RAS, ArcGIS
Subjek : Drainase, Genangan, HEC-RAS, ArcGIS.

Saat ini genangan air seringkali terjadi di beberapa wilayah di Kota Cimahi. Berdasarkan studi literatur, salah satu genangan yang paling tinggi terjadi di Jl. Jend H Amir Machmud yakni 100 cm dengan lama waktu surut 1 – 2 jam. Kondisi ini menyebabkan tingkat kemacetan yang sangat tinggi sehingga dapat memutus akses dari Kota Bandung ke Kota Cimahi maupun sebaliknya. Tugas Akhir ini akan menghitung kapasitas drainase eksisting secara manual maupun otomatis menggunakan software. Input tugas akhir terdiri dari data penampang drainase dari pemerintah Kota Cimahi dan survey pengukuran, data curah hujan, peta topografi, dan data tata guna lahan. Data curah hujan diambil dari Pos Dago Pakar dan Pos Margahayu I dengan metode distribusi yang digunakan adalah Distibusi Gumbel. Berdasarkan hasil hitungan manual didapat Debit Total (Qtot) di saluran drainase pada periode ulang 2 tahun sebesar 2.86 m3/detik, periode ulang 5 tahun sebesar 3.59 m3/detik, dan periode ulang 10 tahun sebesar 4.08 m3/detik dan Debit Saluran (Qsal) eksisting sebesar 2.02 m3/detik sehingga air meluap dari penampang drainase. Aliran Sungai Cilember dengan besar debit banjir periode ulang 2 tahun 59.644 m3/detik, periode ulang 5 tahun 93.736 m3/detik, dan 10 tahun 118.304 m3/detik melintasi Jalan Jenderal Amir Mahmud yang mempengaruhi tinggi genangan di lokasi tinjauan. Untuk mengatasi masalah tersebut, dibuat beberapa model solusi berupa perencanaan saluran drainase baru dengan dimensi terkecil adalah 2 2 m dan dimensi terbesar 3 × 3 m. Sedangkan untuk menangani luapan air dari Sungai Cilember, direncanakan 2 buah goronggorong dengan dimensi 2.5 2.5 m.

Deskripsi Alternatif :

Nowadays water inundation often occur in some areas in the City of Cimahi. Based on the literature study, one of the highest inundation occurred on Jl. Jend H Amir Machmud which is 100 cm with the receding time 1 - 2 hours. This condition causes a very high level of congestion so it can cut access from the City of Bandung to Cimahi City. In addition, of course, this condition can cause damage to the road itself. This Final Project will calculate the existing drainage capacity manually or automatically using software. The final project input consists of drainage cross-section data from Cimahi City government and measurement survey, rainfall data, topographic map, and land use data. Rainfall data is taken from Dago Pakar Rainfall Station and Pos Margahayu I Rainfall Station with distribution method used is Gumbel Distribution. Based on the result of manual calculation, there is Total Debit (Qtot) in drainage channel on 2 year return period of 2.86 m3 / sec, 5 year return period of 3.59 m3 / sec, and a 10-year return period of 4.08 m3 / sec and Channel Debit (Qsal) existing for 2.02 m3 / sec so that the water overflows from the drainage cross section. The Cilember River flows with a large flood discharge period of 2 years period of 59,644 m3 / sec, a 5 year return period of 93,736 m3 / sec, and 10 years 118,304 m3 / sec crossing Amir Mahmud Street affecting high inundation at the site of the review. To overcome the problem, made some model of solution in the form of planning of new drainage channel with the smallest dimension is 2 × 2 m and biggest dimension 3 × 3 m. Meanwhile, to handle the overflow of water from Cilember River, planned 2 pieces of culverts with dimensions 2.5 × 2.5 m.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Dr. Yackob Astor, S.T., M.T.

    Pembimbing 2: Iin Karnisah, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...