Analisa Stabilitas Fondasi Bore Pile Pada Variasi Kedalaman Aktual Yang Berbeda Dengan Kedalaman Rencana Jembatan V (Lima) Kota Baru Parahyangan

Stability Analysis of The Bore pile Foundation on Different Actual Depth Variation with Planned Depth the Bridge V (Five) Kota Baru Parahyangan

Tugas Akhir, 025/ 2018 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2020-01-20 13:14:51
Oleh : 151121045 - Kevin Adya Wirawan - 151121062 - Robi Sabili (kevinadya@gmail.com)
Dibuat : 2020-01-20, dengan 4 file

Keyword : bridge, foundation, bearing capacity, settlement, displacement.
Subjek : jembatan, fondasi, daya dukung tiang, settlement, displacement.

Jembatan V (Lima) berlokasi di Kota Baru Parahyangan, Padalarang, Kabupaten Bandung Barat, Provinsi Jawa Barat. Jembatan ini bertujuan sebagai akses sarana dan prasarana yang menghubungkan daerah Kota Baru Parahyangan dengan Kecamatan Saguling. Dalam pelaksanaan fondasi bore pile Jembatan V terdapat 5 (lima) variasi perbedaan kedalaman aktual dengan kedalaman rencana. Kedalaman yang direncanakan adalah 8 meter untuk setiap tiang fondasi, akan tetapi pada pelaksanaan aktual nya terdapat kedalaman 7.2, 7.3, 9.2, 9.7, dan 9.8 meter. Dari perbedaan kedalaman tersebut daya dukung fondasi akan berubah dari yang telah direncanakan, maka dari itu akan dilakukan analisis perhitungan daya dukung fondasi tiang. Analisis perhitungan daya dukung tiang bertujuan untuk mengetahui apakah fondasi tiang dengan kedalaman aktual stabil (aman terhadap beban yang bekerja) atau tidak (SF ≥ 3). Analisis menggunakan data hasil penyelidikan tanah dilapangan dan laboratorium, yaitu dengan menggunakan berbagai metode diantaranya metode persamaan umum, Terzaghi, Mayerhof dan Tomlinson. Kemudian hasil perhitungan daya dukung perlu dikontrol dan harus memenuhi nilai yang disyaratkan. Kontrol yaitu dengan menghitung nilai distribusi gaya dengan syarat daya dukung tiang yang menerima beban paling besar > beban tersebut, penurunan tiang (settlement) ≤ 5 cm, dan pergeseran kepala tiang (displacement) ≤ 2.54 cm. Dari hasil analisis, tiang fondasi dengan kedalaman aktual dapat dikatakan stabil (aman terhadap beban yang bekerja). Semua hasil analisis perhitungan telah memenuhi syarat, nilai daya dukung tiang fondasi lebih besar dari beban yang bekerja SF = 6,149 > 3, serta nilai distribusi gaya 12521,347/(SF = 3) = 4173,782 kN > 1931,57 kN, penurunan tiang (settlement) 3,899 cm ≤ 5 cm , dan nilai pergeseran kepala tiang (displacement) 0,135 cm ≤ 2.54 cm.

Deskripsi Alternatif :

Bridge V (Lima) is located in Kota Baru Parahyangan, Padalarang, West Bandung regency, West Java Province. This bridge aims to access the facilities and infrastructure that connects the Kota Baru Parahyangan area with Saguling district. In the implementation of the Bridge V bore pile foundation, there are 5 (five) variations of actual depth difference with the planned depth. The planned depth is 8 meters for each foundation pole, but in actual implementation there are 7.2, 7.3, 9.2, 9.7 and 9.8 meters depth. From the difference in depth, the bearing capacity of the foundation will change from what has been planned, therefore the bearing capacity of the foundation should be analyse. The calculation of bearing pile analysis aims to determine whether the pile foundation with actual depth is stable (safe against work load) or not (means: SF ≥ 3). The analysis uses the results of soil investigation in the field and laboratory, using various methods including the general equation method, Terzaghi, Meyerhof and Tomlinson. Then the calculation of bearing capacity needs to be controlled and must meet the required value. The calculation must be controlled by calculating the value of force distribution with the requirement of the bearing capacity of the pole receiving load distribution > the load, the settlement less than equal to 5 cm (≤ 5 cm), and the displacement of the head less than equal to 2.54 cm (≤ 2.54 cm). Based from the analysis results, the foundation piles with actual depth is be stable (safe against the work load). All the results of the calculation analysis have been qualified, the bearing capacity of the foundation pile is greater than the work load SF = 6.149 > 3, and the value of the force distribution 12521.347 / (SF = 3) = 4173.782 kN> 1931.57 kN, decrease settlement 3.899 cm ≤ 5 cm, and displacement value 0.135 cm ≤ 2.54 cm.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Hendry, Dip.Ing.H.T.L., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...