Perhitungan Efisiensi Embung Gedebage dalam Mengatasi Banjir di Kelurahan Cimenerang Kecamatan Gedebage Kota Bandung

Calculation The Eficiency of Gedebage Embung in Overcoming Floods in The Village of Cimenerang Gedebage District, Bandung

Tugas Akhir, 016 / 2020 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2020-12-30 12:39:53
Oleh : Ahmat Akbar - 171121034 & Salman Faris Siddiq - 171121058 (ahmat.akbar.tksi17@polban.ac.id)
Dibuat : 2020-12-30, dengan 4 file

Keyword : Embung, HEC-RAS, flood, efficiency.
Subjek : Embung, HEC-RAS, banjir, efisiensi.

Embung Gedebage merupakan salah satu bangunan penampung air yang difungsikan untuk mengatasi banjir di Daerah Gedebage. Tetapi setelah dibangunnya embung, banjir masih tetap terjadi akibat luapan dari Sungai Cinambo. Oleh karena itu, diperlukan perhitungan efisiensi pembangunan Embung Gedebage agar dapat mengatasi banjir secara keseluruhan. Perhitungan efisiensi embung ini dilakukan dengan beberapa tahap yaitu analisis hidrologi, analisis hidrolika menggunakan software HEC-RAS dan perhitungan efisiensi embung. Adapun data-data sekunder yang digunakan adalah peta citra satelit dari sasplanet dan google earth, curah hujan harian 8 tahun dari 3 stasiun terdekat, peta DEMNAS, serta dimensi Sungai Cinambo. Hasil perhitungan analisis tersebut didapat debit banjir rencana untuk periode ulang 2 tahun sebesar 35,257 m^3/det, periode ulang 5 tahun sebesar 45,894 m^3/det, periode ulang 10 tahun sebesar 51,596 m^3/det, serta periode ulang 25 tahun sebesar 57,628 m^3/det. Berdasarkan analisis unsteady flow didapat luas genangan banjir, kedalaman rata-rata serta waktu mulai banjir. Luas genangan banjir sebelum dibangun embung untuk periode 2, 5, 10, 25 tahun sebesar 72,614 Ha, 87,028 Ha, 101,407 Ha, 113,304 Ha. Luas genangan banjir setelah dibangun embung untuk periode yang sama sebesar 2,238 Ha, 7,669 Ha, 13,444 Ha, 18,410 Ha. Sehingga efisiensi pembangunan embung untuk periode yang sama sebesar 96,918%, 91,188%, 86,742%, 83,751%, 89,650%. Untuk mengatasi banjir yang masih terjadi maka disarankan untuk memperlebar embung seluas 6,5 Ha dengan kedalaman yang sama, atau memperdalam embung sebesar 3 m.

Deskripsi Alternatif :

Embung Gedebage is one of the water storage structures that are used to deal with flooding in the Gedebage area. However, after the construction of the reservoir, flooding still occurred due to overflow from the Cinambo River. Therefore, it is necessary to calculate the efficiency of the construction of the Embung Gedebage to be able to deal with flooding as a whole. The calculation of the efficiency of the reservoir is carried out in several stages, namely hydrological analysis, hydraulic analysis using HEC-RAS software and calculation of the efficiency of the reservoir. The secondary data used are satellite imagery maps from the sasplanet and google eath, 8 years of daily rainfall from 3 nearby stations, DEMNAS maps, and dimensions of the Cinambo River. The results of the calculation of the analysis show that the planned flood discharge for a 2 year return period is 35.257 m^3/s, a 5 year return period is 45.894 m^3/s, a 10 year return period is 51.596 m^3/s, and a 25 year return period 57,628 m^3/s. Based on the unsteady flow analysis, the flood inundation area, average depth and time of flooding were obtained. The area of flood inundation before the embung was built for the period 2, 5, 10, 25 years was 72,614 Ha, 87,028 Ha, 101,407 Ha, 113,304 Ha. The area of flood inundation after the embung was built for the same period was 2,238 Ha, 7,669 Ha, 13,444 Ha, 18,410 Ha. So that the efficiency of the embung construction for the same period is 96.918%, 91.188%, 86.742%, 83.751%, 89.650%. To cope with the on going flooding, it is advisable to widen the reservoir to an area of 6,5 hectares with the same depth, or to deepen the reservoir by 3 m.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. Bambang Setio Budianto, M.Sc., Editor: Muhammad Abdillah Islamy, S.Pd

Download...