Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2018

Koordinasi Proteksi Arus Lebih OCR Di Tegangan Menengah Dengan NH Fuse Di Tegangan Rendah

Coordination Protection Overcurent Of High Voltage Network With NH Fuse Of Low Voltage Network

Tugas Akhir, 005 / 2018 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2018-09-24 11:37:32
Oleh : Ana Maryana Drajat - 151321004 (maryanana04@gmail.com)
Dibuat : 2018-09-24, dengan 4 file

Keyword : OCR, NH Fuse, Simulator Pengujian Hubung Singkat, Koordinasi Proteksi
Subjek : OCR, NH Fuse, Short Circuit Testing Simulator, Protection Coordination

Kebutuhan proteksi dalam sistem distribusi tenaga listrik semakin dibutuhkan untuk meningkatkan TMP ( Tingkat Mutu Pelayanan ) agar dapat mencegah/membatasi kerusakan peralatan akibat gangguan dan mempertahankan penyaluran tenaga listrik kepada konsumen. Gangguan yang sering terjadi pada sistem tenaga listrik adalah gangguan hubung singkat dan beban lebih . Pengaman yang digunakan untuk mengatasi gangguan tersebut diantaranya relai dan Fuse. Dengan adanya perangkat tersebut maka gangguan atau kondisi abnormal lainnya pada bagian sistem yang diamankannya akan terdeteksi melepaskan bagian sistem yang terganggu dan memberikan indikasi adanya gangguan pada jaringan tersebut. Kemudian kedua pengaman tersebut harus di koordinasikan dengan tujuan ketika terjadi gangguan di salahsatu jaringan maka jaringan yang lain tidak ikut terganggu. Koordinasi antara OCR dengan Fuse adalah disimulasikan ketika gangguan terjadi di paling hilir jaringann maka Fuse sebagai pengaman utama harus bekerja lebih cepat dari OCR yang bertugas sebagai pengaman back up. Maksud dari pengaman back up adalah pengaman yang bekerja ketika pengaman utama gagal bekerja. Maka dalam proyek akhir ini penulis akan mensimulasikan koordinasi proteksi arus lebih OCR pada jaringan tegangan menengah dengan NH Fuse pada jaringan tegangan rendah. Dari hasil simulasi, didapat bahwa waktu pemutusan waktu kerja Fuse pada saat terjadi gangguan adalah 0.3 detik, jika Fuse gagal bekerja maka relai MCGG 82 mem-back up yang bekerja secara time delay dengan waktu pemutusan 0.7 detik. Kata Kunci: OCR, NH Fuse, Simulator Pengujian Hubung Singkat, Koordinasi Proteksi.

Deskripsi Alternatif :

Protection needs in electric power distribution systems are increasingly needed to increase TMP (Service Quality Level) in order to prevent / limit equipment damage due to interference and maintain electricity distribution to consumers. Disorders that often occur in electric power systems are short circuit and overload disruptions. The safeguards used to overcome these disorders include relays and Fuse. With the presence of these devices, interference or other abnormal conditions in the secured part of the system will be detected by removing the affected part of the system and giving an indication of interference with the network. Then the two safeguards must be coordinated with the goal when there is interference in one network, the other network is not interrupted. Coordination between OCR and Fuse is simulated when the fault occurs at the most downstream network, Fuse as the main safety must work faster than the OCR which serves as a safety back up. The purpose of backing up is a safety that works when the main safety fails. So in this final project the writer will simulate overcurrent OCR protection coordination on medium voltage networks with NH Fuse on low voltage networks. From the simulation results, it was found that the time to break the Fuse working time in the event of a disturbance is 0.3 seconds, if Fuse fails to work, the MCGG 82 relay backs up which works in time delay with a break time of 0.7 seconds. Keywords: OCR, NH Fuse, Short Circuit Testing Simulator, Protection Coordination.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Hari Purnama, M.Eng.

    Pembimbing 2: Drs. Dwi Asmono, M.Pd., Editor: Erlin Arvelina

Download...