Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2019

Restrukturisasi PHBK Pada Instalasi Listrik Tegangan Rendah di Gedung P2T Lantai 2 Politeknik Negeri Bandung Menurut Standar PUIL 2011 dan PUIL 2000

PHBK Restructuring in Low Voltage Electrical Installation in P2T Floor Building 2 State Polytechnic Of Bandung According To PUIL Standards 2011 and 2000

Tugas Akhir, 006 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-19 11:11:29
Oleh : Ardian Oscar Romeo Septian - 161321006 ( ardianoscarrsh@gmail.com )
Dibuat : 2020-03-19, dengan 4 file

Keyword : Restrukturisasi, PHBK, PUIL 2011 dan K3
Subjek : Renovation, PHBK, PUIL 2011 and K3

Dalam waktu yang cukup lama tidak pernah di adakan restrukturisasi atau penggantian komponen di PHBK pada Gedung P2T lantai 2 Politeknik Negeri Bandung (POLBAN). Oleh Karena itu, di perlukan pengecekan dari tiap komponen baik kelayakan atau kinerja dari tiap komponen maupun keseimbangan beban pada instalasi tersebut. Pada bagian perhitungan keseimbangan beban akan diakukan oleh rekan kerja penulis, yaitu Asep Surya Lesmana. Setelah melakukan perhitungan keseimbangan beban maka akan didapat rekomendasi penggantian komponen dan untuk mencapai keseimbangan beban yang tertulis pada PUIL 2011 2.1.2.3 tentang desain instalasi listrik bagian e poin 6 sedangkan untuk rekomendasi visual mengacu kepada PUIL 2011 bagian 5 - 511. Penggantian ini dilakukan dengan mengacu pada standar pada PUIL 2011 tentang standar instalasi listrik, restrukturisasi dilakukan dengan mempertimbangkan aspek pemakaian dan keamanan dari tiap komponen, serta keamanan dari orang juru yang mengacu ke standar K3.

Deskripsi Alternatif :

In a long time, there has never been a restructuring or replacement of components in PHBK in the P2T Building on the 2nd floor of the Bandung State Polytechnic (POLBAN). Therefore, it is necessary to check each component both the feasibility or performance of each component and the balance of the load on the installation. In the calculation of the balance the load will be carried out by the co-worker of the author, namely Asep Surya Lesmana. After calculating the load balance, a component replacement recommendation will be obtained and to achieve the load balance written in PUIL 2011 2.1.2.3 regarding the design of the electrical installation part e point 6 while for the visual recommendation refer to PUIL 2011 section 5 - 511. This replacement is done by referring in the PUIL 2011 standard regarding electrical installation standards, restructuring is carried out by considering the aspects of use and security of each component, as well as the security of the interpreter who refers to the K3 standard.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Robert Adriaan Philippus, S.ST., M.Eng.


    Pembimbing 2: Trisnawiyana, S.ST., M.Eng. , Editor: Muhammad Abdillah Islamy, S.Pd

Download...