Path: Top > Tugas Akhir - D3 > Jurusan Teknik Sipil > Program Studi Konstruksi Sipil > 2014

Pengendalian Banjir Dengan Sistem Polder Di Desa Cieunteung Kecamatan Baleendah

Flood Control With Polder System In Cieunteung Village District Baleendah

Tugas Akhir, 013 / 2014 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2018-04-13 10:30:53
Oleh : Arif Kurnia - 111121004 & Rita Puspita - 111121056 (arifkurnia04@gmail.com)
Dibuat : 2018-04-13, dengan 4 file

Keyword : Dimensi, Kebutuhan Pompa, Kolam Penampung, Sistem Polder
Subjek : Dimensions, Pump Supplies, Swimming Containers, Polder System

Desa Cieunteung sering mengalami banjir yang menggenangi hampir sebagian besar wilayahnya, wilayah tersebut merupakan daerah cekungan. Upaya yang tepat untuk mengatasi permasalahan banjir di Desa Cieunteung secara struktural adalah dilakukan kegiatan sistem pengendalian banjir dengan merencanakan sistem polder. Perencanaan sistem polder ini diutamakan untuk mengurangi debit yang mengalir melalui sungai saat debit puncak terjadi sehingga air tidak meluap di titik-titik yang rawan banjir. Berdasarkan analisis hidrologi perencanaan sistem polder ini curah hujan rata-rata dihitung dengan metoda Aljabar dan analisa frekuensi dihitung dengan metoda Log Pearson Type III, perhitungan debit banjir rencana menggunakan HSS Nakayasu dan HSS Snyder-Alexeyev diperoleh debit banjir rencana dengan kala ulang 100 tahunan 5,35 m3/dt. Dari perencanaan hidrolis dengan luas polder direncanakan 6500 m2 dan mempunyai kedalaman 2m dan tinggi jagaan direncanakan 0,5m. Kolam penampung yang direncakanan adalah 16250 m3 cukup untuk menampung debit banjir yang masuk ke kolam penampung dengan kapasitas pompa 1m3/det dengan jumlah 3 buah pompa untuk kala ulang 100 tahun, untuk menguras air banjir sehingga air banjir tidak meluap sesuai dengan kapasitas tampungan. Kata Kunci: Dimensi, Kebutuhan Pompa, Kolam Penampung, Sistem Polder.

Deskripsi Alternatif :

Cieunteung village frequently suffered floods that inundated most of the territory, the region is an area of the basin. Appropriate measures to resolve problem of flooding in the village of structurally Cieunteung activity is done with the flood control system plan polder system. Planning polder system is preferred to reduce the discharge current flowing through the river peak discharge occurs so that the water does not overflow in spots prone to flooding. Based on the analysis of hydrologic planning polder system is the average rainfall calculated by the method of algebra and analysis frequencies calculated by Log Pearson Type III method, the calculation of flood discharge plan using HSS Nakayasu and HSS Snyder-Alexeyev obtained when the flood discharge plan with the 100 year on 5,35 m3/s. Of planning to extensive hydraulic planned polder 6500 m2 and has a depth of 2 m and 0,5 m high guard planned. Reservoirs that is planned is 16250 m3 enough to accommodate the flood discharge into the pond pump reservoir with a capacity of 1 m3/s with number 3 pumps for 100 year when on, so the flood water to drain flood water does not overflow within the capacity of reservoirs. Keywords: Dimensions, Pump Supplies, Swimming Containers, Polder System.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. Dede Syarifudin, S.P1., Editor: Erlin Arvelina

Download...