Analisa Perbandingan Metode Pelaksanaan Dan Rab Struktur Pelat Lantai Menggunakan Half Slab Dan Metal Deck Pada Gedung Kuliah Baru Akuntansi Politeknik Negeri Bandung

Comparative Analysis Of Implementation Methods And Estimated Budget Plan On Floor Structure Using Half Slab And Metal Deck At Accounting Major's New Building In Politeknik Negeri Bandung

Tugas Akhir, 004 / 2017 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2017-10-24 14:43:45
Oleh : Arisha Virgiara Hasanah - 141111005 & Elisabeth Romaito Samosir - 141111010 (elisabethsamosir87@gmail.com)
Dibuat : 2017-10-24, dengan 4 file

Keyword : Metoda Pelaksanaan, Rencana Anggaran Biaya, Penjadwalan
Subjek : Implementation methods, estimated budget plans, scheduling

Proyek konstruksi merupakan suatu rangkaian kegiatan yang saling berkaitan untuk mencapai tujuan tertentu (bangunan/konstruksi) dalam batasan waktu, biaya dan mutu. Tugas akhir ini mencakup pembahasan mengenai perbandingan rangkaian metoda pelaksanaan, Rencana Anggaran Biaya dan penjadwalan. Metoda pelaksanaan yang akan dibahas hanya meliputi pekerjaan struktur atas, khususnya pekerjaan pelat lantai dengan menggunakan material half slab dan metal deck. Proses pemasangan kedua material tersebut hampir sama, hanya saja pada metal deck membutuhkan scaffolding sebagai penyangga. Metode pelaksanaan untuk pelat lantai half slab memiliki durasi yang lebih lama dalam pemakaian alat berat karena pengangkatannya dilakukan satu per satu. Perhitungan biaya pelaksanaan proyek dapat diperoleh dari beberapa data yaitu Harga Satuan Pekerjaan (HSP) dan volume dari masing-masing pekerjaan. Sehingga diperoleh total biaya Rencana Anggaran Biaya dengan menggunakan pelat lantai metal deck Rp 9,248,050,000.00 sedangkan half slab Rp 9,232,330,000.00. Selisih yang didapat antara perhitungan RAB kedua pelat lantai adalah sebesar Rp 14,277,440.72, hal ini karena perbedaan biaya dalam penggunaan scaffolding dan ukuran wiremesh yang digunakan pada metode tersebut berbeda. Penjadwalan proyek dapat dianalisis dengan menggunakan dua metoda yaitu dengan kurva S dan CPM (Critical Path Method). Pada pembuatan kurva S dibutuhkan beberapa data yaitu bobot pekerjaan dan durasi, sedangkan CPM dapat menentukan pekerjaan yang kritis/tidak boleh terlambat. Sehingga akan diperoleh perbandingan durasi waktu pelaksanaan dengan kedua metoda tersebut yaitu metode pelaksanaan dengan metoda metal deck lebih singkat 2 hari, dibandingkan dengan metoda half slab. Kata Kunci: Metoda Pelaksanaan, Rencana Anggaran Biaya, Penjadwalan.

Deskripsi Alternatif :

A construction project is a series of interrelated activities to achieve certain goals (buildings/constructions) within the time, cost, and quality. This present project discusses the comparison of a set of implementation methods, estimated budget plans, and scheduling. The implementation methods include the upper structural work, especially floor work which used half slab and metal deck. Process installation both of the material is almost the same, it's just that a metal deck need scaffolding as a buffer. Method implementation for a half slab have a longer duration in the use of heavy equipment because the lifting was done one by one. The calculation of the project's cost can be calculated from Harga Satuan Pekerjaan (HSP) and the volume of each work. With those calculating techniques, more economical budget plan on the floor plates using metal deck are obtained with the total cost of Rp 9,248,050,000.00 , while the half slab Rp 9,232,330,000.00. The difference between the calculation RAB both of the floor plate is Rp 14,277,440.72, this is because of the difference in costs in the use of scaffolding and wiremesh size. Project scheduling can be analyzed using two methods. They are S curve and CPM (Critical Path Method). There are some data in the S curve such as the weight of the work and the duration. By using both methods, the comparison of time execution will be obtained. Time for the implementation of the method of metal deck is shorter 2 days, compared to the half slab. Keywords: Implementation methods, estimated budget plans, scheduling.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Muchtar, S.ST., M.T.

    Pembimbing 2: Ery Radya Juarti, S.T., M.T., Editor: Erlin Arvelina

Download...