Penerapan BIM pada Konstruksi Rumah Tinggal Deret Beton Pracetak Prefabrikasi

Application of BIM in The Construction of Precast and Prefabricated Row House

Tugas Akhir, 002 / 2021 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2022-05-23 11:13:19
Oleh : Ayu Rahmani - 181111002 & Rd. Hanifah Asyifa Nurachmah - 181111023 (ayu.rahmani.tkgd18@polban.ac.id)
Dibuat : 2022-05-23, dengan 4 file

Keyword : BIM, Precast Concrete Residence, RAB, Scheduling
Subjek : BIM, Rumah Tinggal Beton Pracetak, RAB, Penjadwalan

Building Information Modelling (BIM) menjadi sebuah sistem yang sangat praktis bagi bidang konstruksi, dimana BIM dapat membantu dalam menginformasikan perencanaan hingga masa perawatan pada bangunan. Dalam era kemajuan teknologi dimasa sekarang, kolaborasi antara rumah tinggal dengan komponen utama adalah beton pracetak dan kecepatan informasi bangunan pada software BIM menjadi hal yang efektif dan efesien. Hal ini dapat menekan biaya yang diperlukan untuk pembangunan dan juga waktu pelaksanaan yang lebih cepat dibandingkan dengan rumah yang berkomponen beton cor. Pemodelan rumah tinggal beton pracetak 1 lantai dan 2 lantai, penulis memodelkan rumah pada software SketchUp untuk menggambarkan desain rumah dan rumah deret yang dibuat. Setelah desain visual, selanjutnya memodelkan struktur rumah pada software Tekla Structure untuk mengoutputkan volume material dan Bar Bending Schedule (BBS) sehingga dapat digunakan untuk menghitung anggaran biaya dan penjadwalan. Perhitungan Rencana Anggaran Biaya yang direncanakan untuk pembuatan sampai dengan pelaksanaan konstruksi rumah tinggal beton pracetak adalah Rp. 88.756.000,00 untuk rumah tinggal 1 lantai dengan waktu pelaksanaan 8 hari. Sedangkan untuk rumah tinggal beton pracetak 2 lantai biaya yang dibutuhkan adalah Rp. 110.240.000,00 dengan waktu pelaksanaan 10 hari.

Deskripsi Alternatif :

Building Information Modelling (BIM) becomes a very practical system for the construction sector, where BIM can assist in informing planning until the maintenance period on the building. In today's technological advancement era, collaboration between residential and main components is precast concrete and the speed of building information on BIM software becomes effective and efficient. This can reduce the costs required for construction and also faster execution times compared to cored concrete-cored houses. In applying modeling precast concrete dwelling houses 1 floor and 2 floors, the author modeled the house on SketchUp software to describe the design of the house and the house series made. After the visual design, it then models the structure of the house in Tekla Structure software to output the volume of material and Bar Bending Schedule (BBS) so that it can be used to calculate cost budget and scheduling. Based on the calculation of the Cost Budget Plan required for the manufacture up to the implementation of precast concrete residential house construction is Rp. 88.756.000,00 for a 1-story residence with an implementation time of 8 days. As for precast concrete dwellings 2 floors the cost required is Rp. 110.240.000,00 with an implementation time of 10 days.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Yulianto P.K., M.M.


    Pembimbing 2: Drs. Husnul Fikri, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...