Rencana Anggaran Biaya dan Penjadwalan berdasarkan Pembagian Zona pada Proyek Apartement Arumaya Residence

Budget Plan and Schedule Based on Zone Division in Arumaya Residence Apartment Project

Skripsi, 007 / 2021 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2022-09-23 13:24:47
Oleh : Ayyash Abdul Karim Rahmat - 171144007 & Syahrul Malik Dirgantara - 171144029 (ayyasabdul16@gmail.com)
Dibuat : 2022-09-23, dengan 4 file

Keyword : Zona Pekerjaan, Rencana Anggaran Biaya (RAB), Penjadwalan
Subjek : Work Zone, Budget Plan, Scheduling

Dalam sebuah proyek konstruksi masih sering ditemukan biaya yang tidak terencana dan jadwal yang terlambat sehingga terganggunya perencanaan proyek. Untuk mencapai keberhasilan dalam melaksanakan suatu proyek konstruksi diperlukan perencanaan yang terstruktur, efektif, dan efisien. Oleh hal itu, proyek konstruksi diperlukan manajemen yang baik agar tercapainya tujuan dari pembangunan tersebut seperti rencana anggaran biaya yang direncanakan dan sistem penjadwalan. Dalam tugas akhir ini bahasan yang akan dibahas adalah menghitung rencana anggaran biaya (RAB) dan merencanakan penjadwalan berdasarkan pembagian zona dan siklus cor pada pelaksanaan pekerjaan basement dan struktur atas proyek Apartement Arumaya Residence. Zona pekerjaan dan siklus cor menjadi dasar dalam perencanaan penjadwalan sedangkan untuk Rencana Anggaran Biaya sendiri didapatkan dengan cara menghitung bill of quantity (BOQ) berdasarkan gambar yang dikalikan dengan analisa harga satuan pekerjaan yang mengacu pada Daftar Harga Satuan DKI Jakarta tahun 2020 dan Peraturan Menteri PUPR No. 28 tahun 2016. Untuk penjadwalan dirancang dengan menggunakan bantuan aplikasi Microsoft Project sesuai dengan kurva S yang sudah dirancang. Pada perencanaan, proyek yang ditinjau dibagi 4 zona untuk bagian basement dan 3 zona untuk lantai 1 sampai dengan lantai 23, biaya pelaksanaan untuk struktur pada basement dan lantai 1 sampai dengan lantai 23 pada proyek Apartement Arumaya Residence Jakarta Selatan ini didapatkan besar rencana anggaran biaya sebesar Rp. 108.752.801.950,00 biaya tersebut sudah termasuk biaya profit dan biaya overhead. Untuk perencanaan penjadwalan pada pekerjaan struktur untuk basement dan lantai 1 sampai dengan 23 sendiri dilaksanakan selama 454 hari kerja. Kata kunci: Zona Pekerjaan, Rencana Anggaran Biaya (RAB), Penjadwalan.

Deskripsi Alternatif :

In a construction project, unplanned costs and late schedules are often found so that project planning is distrupted. To achieve success in implementing a project, a structured, effective, and efficient planning is needed. Therefore, a construction project requires good management in order to achieve the objectives of the development such as the planned budget plan and scheduling system. In this final project, the discussion that will be discussed is calculating the budget plan (RAB) and planning scheduling based on the division of zones and cast cycles on the implementation of the work on the basement and superstructure of the Arumaya Residence Apartment project. The work zone and cast cycle are the basis for scheduling planning, while the cost budget plan or RAB itself is obtained by calculating the bill of quantity (BOQ) based on the drawings multiplied by the work unit price analysis which refers to the 2020 DKI Jakarta Unit Price List and PUPR Ministerial Regulation No. 28 of 2016. Scheduling is designed using the help of the Microsoft Project application according to the S curve that has been designed. In planning, the project under review is divided into 4 zones for the basement and 3 zones for the 1st floor to the 23rd floor, the implementation costs for the structure on the basement and 1st floor to 23rd floor in the South Jakarta Arumaya Residence Apartment project obtained a large budget plan of Rp. Rp. 108,752,801,950.00, These costs include profit costs and overhead costs. Scheduling planning for structural work for basements and floors 1 to 23 itself is carried out for 454 working days. Keywords: Work Zone, Budget Plan, Scheduling.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ujang Ruslan, S.T., M.T.

    Pembimbing 2: Ahmad Solih, S.T., M.T., Editor: Erlin Arvelina

Download...