Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2021

Perencanaan Sistem Instalasi Plambing Dengan Memanfaatkan Air Hujan Dan Grey Water Untuk Pemenuhan Kebutuhan Air Non-Konsumtif Pada Gedung Apartemen Yukata Suites.

Plumbing Installation System Planning By Utilizing Rainwater And Gray Water To Fulfill Non-Consumptive Water Needs In The Yukata Suites Apartment Building.

Tugas Akhir, 005 / 2021 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2022-05-23 11:33:42
Oleh : Dafa Rizkia Maulana Berfin - 181111005 & Mochamad Azmi Ghifari - 181111018 (dafa.rizkia.tkgd18@polban.ac.id )
Dibuat : 2022-05-23, dengan 4 file

Keyword : Plumbing, Installation System, Utilizing Rainwater, Gray Water, Fulfill Non-Consumptive Water Needs, Yukata Suites Apartment
Subjek : Sistem Instalasi Plambing, Air Hujan, Grey Water, Pemenuhan Kebutuhan Air Non-Konsumtif, Apartemen Yukata Suites

Apartemen yang mengusung konsep hunian nyaman dan modern yaitu Apartemen Yukata Suites. Apartermen tersebut terletak di Alam Sutera, Tangerang dan berdiri di atas lahan 5000 m2 memiliki 34 lantai ditambah 3 lantai basement dengan jumlah 363 unit. Sumber air yang digunakan untuk memenuhi kebutuhan air bersih apartemen menggunakan air PDAM yaitu untuk kebutuhan air konsumtif dan non konsumtif. Apartemen tersebut dibangun untuk memenuhi kebutuhan hunian masyarakat perkotaan. Sehubungan dengan kebutuhan air bersih dari air PDAM, maka biaya yang dikeluarkan untuk oprasional kebutuhan air bersih sangat besar. Dengan demikian untuk mengurangi biaya pada oprasional kebutuhan air bersih, maka kebutuhan air non konsumtif harus diambil dari sumber lain. Yaitu dengan memanfaatkan grey water dan air hujan untuk keperluan flushing, kolam renang dan siram tanaman. Sehingga supplesi air PDAM menjadi berkurang. Berdasarkan perhitungan hasil air dari grey water 227,8 m3/hari dan dari air hujan 6,18 m3/hari hujan. Yang ditampung pada bak berkapasitas 240 m3 berdimensi 10 x 8 x 3m. Air baku tersebut diolah melalui biofilter dengan kapasitas 80 m3 setelah dari biofilter air ditampung pada bak berkapasitas 80 m3 yang berdimensi 8 x 4 x 2,5m dialirkan ke bak penampungan atas yang berkapasitas 150 m3 yang berdimensi 10 x 5 x 3m dengan bantuan pompa Ebara Pump yang berkapasitas 90 kw. Sehubungan dengan kondisi sisa tekanan masih terjadi minus maka tekanan aliran air dibantu dengan pompa booster berkapasitas 13 m. Pengolahan air recycle membutuhkan biaya sebesar Rp 1.507.063.226,00.

Deskripsi Alternatif :

The apartment that carries the concept of comfortable and modern housing is the Yukata Suites Apartment. The apartment is located in Alam Sutera, Tangerang and stands on an area of 5000 m2 with 34 floors plus 3 basement floors with a total of 363 units. The water source used to meet the apartment's clean water needs uses PDAM water, namely for consumptive and non-consumptive water needs. The apartment was built to meet the residential needs of urban communities. In connection with the need for clean water from PDAM water, the costs incurred for the operational needs of clean water are very large. Thus, to reduce the operational costs of clean water needs, non-consumptive water needs must be taken from other sources. Namely by utilizing gray water and rainwater for flushing purposes, swimming pools and watering plants. So that the PDAM water supplementation is reduced. Based on the calculation of the water yield from gray water 227.8 m3/day and from rain water 6.18 m3/rainy day. Which is accommodated in a tub with a capacity of 240 m3 with dimensions of 10 x 8 x 3m. The raw water is treated through a biofilter with a capacity of 80 m3 after the water is collected from the biofilter in a tub with a capacity of 80 m3 with dimensions of 8 x 4 x 2.5m and flows into an upper reservoir with a capacity of 150 m3 with dimensions of 10 x 5 x 3m with the help of the Ebara Pump. with a capacity of 90 kW. In connection with the condition that the residual pressure is still minus, the water flow pressure is assisted by a booster pump with a capacity of 13 m. Recycle water treatment costs Rp. 1.507.063.226.00.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ahmad Sofyan, S.ST., M.Eng.


    Pembimbing 2: Dra. Ruth Ester Ambat, M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...