Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2017

Analisis Kapasitas Elemen Struktur Beton Bertulang Gedung Rusunawa Stikes Budi Luhur Cimahi

Capacity Analysis Of Reinforced Concrete Structural Elements Of Rusunawa Building Stikes Budi Luhur Cimahi

Tugas Akhir, 007 / 2017 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2018-03-01 14:59:55
Oleh : Dede Fachrurozi - 141111009 & Billy Satria Dwitama - 141111040
Dibuat : 2018-03-01, dengan 4 file

Keyword : kapasiatas, elemen, struktur beton bertulang
Subjek : capacity, element, reinforced concrete structure

Suatu rumah hunian yang aman juga kokoh, maka Gedung Rusunawa STIKES Budi Luhur ini harus bisa menahan kapasitas beban, diantaranya yaitu beban gravitasi dan beban gempa. Meskipun telah di bangun, rusunawa harus dianalisis terhadap peraturan dan ketentuan yang sesuai karena dari data Respon Spektra pada daerah proyek pembangunan Rusunawa Budi Luhur yang bertempat di Cimahi, ini mempunyai dampak besar yang harus diperhitungkan untuk ketahannya. Maka dengan kondisi tersebut perlu adanya analisis kapasitas struktur utama, seberapa besar kekuatan yang akan ditahan serta apakah struktur tersebut memenuhi peraturan serta dapat diperhitungkan volume kebutuhan tulangan. Metoda yang digunakan, dengan cara menganalisis kapasitas elemen elemen struktur yang digunakan adalah Sistem Rangka Pemikul Momen Menengah (SRPMM) untuk mengetahui gaya-gaya dalam momen lentur, aksial, dan geser yang terjadi dan momen ultimate sebagai acuan menggunakan peraturan pembebanan SNI 1726 2012 dan membandingkan peraturan lama dengan peraturan terbaru yaitu SNI-2847-2013 untuk dilanjutkan dengan perhitungan kebutuhan tulangan BBS terhadap elemen pelat, balok dan kolom. Selanjutnya menghitung volume penulangan atau Bar Bending Schedule dari gambar rencana, yaitu berisi lembar atau format yang melengkapi semua penggambaran dan penulisan yang disyaratkan, yaitu sketsa bentuk tulangan, ukuran tulangan (diameter dikali panjang bahan, panjang tekuk, radius tekuk) jumlah dan berat tulangan, serta arus atau alir pemakaian sisa material. Hasil analisis elemen kolom dengan dimensi 300 x 400 mm2 , balok 250 x 400 mm2 dan tebal pelat 130, hanya pelat yang memenuhi SNI-2847. Untuk jumlah tulangan balok dan kolom yang digunakan harus di tambah, yaitu jumlah tulangan lebih besar dari empat (jumlah tulangan <4). Pada perhitungan volume kebutuhan tulangan BBS, pada struktur utama untuk 3 lantai gedung Rusunawa membutuhkan tulangan Ø10 sebanyak 8915 batang dan tulangan Ø16 sebanyak 2200 batang. Kata kunci: kapasiatas, elemen, struktur beton bertulang.

Deskripsi Alternatif :

A safe residential home is also sturdy, then Rafters STIKES Budi Luhur building should be able to withstand load capacity, including the load of gravity and earthquake load. Although it has been built, the rusunawa should be analyzed against the appropriate rules and regulations because of the Spectrum Response data in the Budi Luhur Rusunawa development project located in Cimahi, this has a big impact to be reckoned with for its resilience. So with these conditions it is necessary to analyze the capacity of the main structure, how much strength will be retained and whether the structure meets the rules and can be calculated the volume of reinforcement needs. The method used by analyzing the capacity of structural elements used is Medium Moment Resistive Frame System (SRPMM) to find the forces in bending, axial, and shear moments and ultimate moments as reference using SNI 1726 2012 and comparing rules the old regulation with the latest regulation is SNI-2847-2013 to proceed with calculation of BBS reinforcement requirement to plate element, beam and column. Next calculates the reinforcement volume or Bar Bending Schedule of the plan drawing, which contains a sheet or format that completes all the required drawings and drawings, namely reinforcement sketches, reinforcement size (diameter multiplied by material length, bending length, bending radius) amount and weight of reinforcement, as well as the flow or flow of waste material usage. Results of analysis of column elements with dimensions of 300 x 400 mm2, blocks of 250 x 400 mm2 and 130 plate thickness, only plates that meet SNI-2847. For the number of bars and columns used must be added, ie the number of reinforcement is greater than four (number of reinforcement <4). In calculating the volume of reinforcement requirements BBS, the main structure for 3 floors of the Rusunawa building requires Ø10 reinforcement as much as 6708 stems and reinforcement Ø16 as much as 2070 stems. Keywords: capacity, element, reinforced concrete structure.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ambar Susanto, S.T.Si., M.T.

    Pembimbing 2: Drs. Husnul Fikri, S.T., M.T., Editor: Erlin Arvelina

Download...