Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2019

Studi kebutuhan daya motor lift penumpang berdasarkan SNI No. 03-6573-2001 di Hotel Sakti Bandung

English: Study of the needs passengger elevator motors based on SNI No. 03-6573-2001 in Sakti Hotel Bandung

Tugas Akhir, 036 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-24 09:18:04
Oleh : Deris Febsiansyah - 161321038 (derisfebriansyah28@gmail.com )
Dibuat : 2020-03-24, dengan 4 file

Keyword : needs passengger, elevator motors, SNI No. 03-6573-2001, Sakti Hotel Bandung
Subjek : kebutuhan daya, motor lift penumpang, SNI No. 03-6573-2001, Hotel Sakti Bandung

Hotel bertingkat harus memiliki fasilitas lift yang mampu melayani tamu hotel dengan nyaman dan aman, ketika hotel memiliki kapasitas tamu maksimum kebutuhan lift harus mampu melayani tamu hotel, sehingga kecepatan dan kapasitas angkut lift harus ditentukan untuk jumlah tamu yang harus terlayani. Penulis mengambil judul Studi Kebutuhan Daya Motor Lift Penumpang Berdasarkan SNI No. 03-6573-2001 Di Hotel Sakti Bandung. Penelitian ini menggunakan metode observasi, wawancara, dan studi literatur penelitian sebelumnya yang terkait dengan lift serta regulasi dari instalasi lift di Indonesia. Melalui metode tersebut didapatkan data mengenai analisis lalu lintas lift dan populasi manusia yang terdapat di hotel sehingga dapat dilakukan Perhitungan ulang mengenai kebutuhan lift penumpang yang selanjutnya dilakukan analisis hasil perhitungan ulang dengan data existing lift di hotel tersebut. Permasalahan yang akan dibahas adalah kecepatan lift, kapasitas lift, daya motor lift dan pengaman penghantar instalasi listrik tenaga sehingga menjadi pengetahuan untuk menentukan motor lift sesuai dengan standar nasional indonesia. Dari hasil studi observasi dan wawancara didapatkan bahwa lift yang terpasang di hotel tersebut memiliki kecepatan lift 105 mpm (1,75 m/s), kapasitas daya angkut lift 1.000 kg (15 orang) dan daya output motor 16 kW. Setelah dilakukan perhitungan ulang didapatkan hasil yang sesuai Standar Nasional Indonesia tentang perencanaan lift, rekomendasi untuk lift tersebut kecepatan lift menjadi 120 mpm (2m/s), kapasitas daya angkut lift 1.000 kg (15 orang), ), daya keluaran motor 13,07 kW.

Deskripsi Alternatif :

Multilevel hotels must have elevator facilities that are able to serve hotel guests comfortably and safely, when the hotel has a maximum guest capacity the lift needs to be able to serve hotel guests, so the speed and lift capacity of lifts must be determined for the number of guests that must be served. The author takes the title Study of Passenger Lift Motor Power Needs Based on SNI No. 03-6573-2001 At Sakti Hotel Bandung. This study uses the method of observation, interviews, and studies of previous research literature related to elevators as well as regulations of elevator installations in Indonesia. Through this method the data obtained about the analysis of elevator traffic and the human population contained in the hotel so that it can be recalculated about the needs of passenger lifts which are then carried out an analysis of the results of recalculation with existing elevator data at the hotel. Issues that will be discussed are elevator speed, lift capacity, elevator motor power and safety of the conductor of electrical power installations so that it becomes knowledge to determine the motor lift in accordance with Indonesian national standards. From the results of observational studies and interviews found that the elevator installed at the hotel has an elevator speed of 105 mpm (1.75 m / s), a lift capacity of lift capacity of 1,000 kg (15 people) and a motor output power of 16 kW. After recalculating the results obtained in accordance with the Indonesian National Standard regarding elevator planning, the recommendation for the elevator is the elevator speed to 120 mpm (2m / s), the lift carrying capacity of 1,000 kg (15 people),), the motor output power is 13.07 kW.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Abdullah Asegaf, M.T.


    Pembimbing 2: Yoseph Santosa, S.T., M.Eng., Editor: Muhammad Abdillah Islamy, S.Pd

Download...