Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Sipil > 2021

Perancangan Ulang Jembatan Rangka Baja Jalur Kereta Api Petak Bumiayu - Linggapura KM. 305 DAOP 5 Purwokerto

Redesign of the Steel Railway Truss Bridge for the Route Petak Bumiayu - Linggapura KM. 305 DAOP 5 Purwokerto

Tugas Akhir, 023 / 2021 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2022-05-17 10:13:09
Oleh : Dio Reka Krisnawanto - 181121048 & Riki Abdul Rozak - 181121062 (riki.abdul.tksi18@polban.ac.id )
Dibuat : 2022-05-17, dengan 4 file

Keyword : Collapse, Railway Bridge, Structural Design, Superstructure Calculation, Planning
Subjek : Ambruk, Jembatan Rel Kereta Api, Desain Struktur, Perhitungan Struktur Atas, Perencanaan

Jembatan Rel Kereta Api Tonjong adalah jembatan yang terletak di Desa Tonjong Kecamatan Tonjong, Kabupaten Brebes, Jawa Tengah, jembatan ini menghubungkan antara petak Bumiayu dengan Linggapura. Jenis dari jembatan ini adalah jembatan rangka baja dengan tipe rangka rasuk. Jembatan ini memiliki bentang 110 meter dengan ketinggian 22 meter di atas sungai Glagah. Jembatan berusia ratusan tahun peninggalan masa kolonialisme tersebut mengalami ambruk karena diterjang banjir deras. Panjang bagian jembatan yang ambruk total 40 meter dari sisi arah Bumiayu. Mengingat banyaknya perjalanan yang melintasi jalur ini, maka jembatan harus segera dibangun ulang. Penulis merancang desain struktur atas jembatan menggunakan struktur baja rangka dengan tipe warren truss dengan dimensi jembatan tinggi total 6 m dan lebar 5 m. Analisa perhitungan struktur atas harus dilakukan agar nantinya jembatan dapat memikul beban yang terjadi. Hasil analisis perencanaan struktur didapatkan gelagar memanjang dan melintang menggunakan profil IWF 800.300.16.30. Rangka induk atas dan bawah serta batang rangka diagonal menggunakan IWF 250.250.14.14. ikatan angin melintang atas menggunakan profil IWF 150.150.7.10 dan ikatan angin diagonal atas menggunakan profil L 100.100.12 sedangkan mutu baja yang digunakan yaitu BJ 50 dan BJ 41 untuk profil ikatan angin melintang atas. Sambungan antar elemen struktur menggunakan baut mutu tinggi dan sambungan las. Lendutan jembatan yang terjadi pada gelagar sebesar 2,47 mm < lendutan ijin 25 mm dan pada rangka sebesar 2,88 mm < lendutan ijin 20 mm.

Deskripsi Alternatif :

The Tonjong Railway Bridge is a bridge located in Tonjong Village, Tonjong District, Brebes Regency, Central Java, this bridge connects the Bumiayu plot with Linggapura. The type of this bridge is a steel truss bridge with a penetrating truss type. This bridge has a span of 110 meters with a height of 22 meters above the Glagah river. The bridge, which is a legacy of the colonialism era, collapsed due to heavy flooding. The length of the bridge that collapsed a total of 40 meters from the side of the direction of Bumiayu. Given the many trips that cross this route, the bridge must be rebuilt immediately. The author designed the structural design of the bridge using a steel truss structure with a warren truss type with the dimensions of the bridge a total height of 6 m and a width of 5 m. Analysis of the calculation of the superstructure must be carried out so that later the bridge can bear the load that occurs. The results of the structural planning analysis obtained stringer and crossgirders using the IWF profile 800.300.16.30. The upper and lower main trusses and diagonal trusses use IWF 250.250.14.14. The upper transverse wind ties using the IWF 150.150.7.10 profile and the upper diagonal wind ties using the L 100.100.12 profile while the quality of steel used is BJ 50 and BJ 41 for the upper transverse wind bond profile. Connections between structural elements using high strength bolts and welded joints. The bridge deflection that occurs on the girder is 2.47 mm < the allowable deflection of 25 mm and on the truss is 2.88 mm < the allowable deflection of 20 mm.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: A. Zulpanani, S.T., M.T.


    Pembimbing 2: Fisca Igustiany, S.ST., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...