Path: Top > Journal Politeknik Negeri Bandung > Unit Penelitian Pengabdian kepada Masyarakat (UPPM) > SPEKTRUM > Volume XI Nomor 1 April 2003

Evaluasi Penyalur Kilat/Petir yang Dipasang di Bangunan Gedung di Politeknik Negeri Bandung

Journal from JBPTPPOLBAN / 2013-08-01 11:25:37
Oleh : Dwi Asmono; Hari Purnama; Heru Kiswanto (asmonodwi@gmail.com)
Dibuat : 2013-08-01, dengan 1 file

Keyword : Control Box, Electrode, BC Cable, Finial

.

Deskripsi Alternatif :

The evaluation of a lightning conductor which installed in Politeknik Negeri Bandung that consist of control box condition, conducting cable (BC-Bar Conductor Cable) and the electrode volume/resistance replacement. The data collection method for control box and conducting cable was carried out through describing the available condition qualitatively, whilst the data collection method for the resistance replacement was done through measurement applied instrument “Hioki Earth Tester 3150” of the two configurations, these are, horizontal and triangular configurations. From the finding of three variables, it can be concluded that control box which categorized as good = 57.30%, the control buried underground/cement-floor category = 29.85% and the control box in the broken category = 13,27%, and the cable BC with empty category = 6.63%. The resistance replacement in the low category ( ≤ 0.025 Ohm ) = 0%, the resistance replacement in the mid category ( = 1 Ohm ) = 80,78%, whist the resistance replacement in the high category ( ≥ 1 Ohm = 15.38% ).

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • , Editor: Idayu Gemalia

Download...