Perancangan Alat Handling Engine Tipe M274 Untuk Proses Engine Test Di PT Mercedes-Benz Indonesia

Design of Handling Equipment Engine Type M274 to Engine Test Process at PT Mercedes-Benz Indonesia

Skripsi, 006 / 2018 / TPKM
Undergraduate Theses from JBPTPPOLBAN / 2019-01-15 12:56:49
By : Erik Nuraga - 141234008 (erik.nuraga.tpkm14@polban.ac.id)
Created : 2019-01-15, with 4 files

Keyword : handling engine, dyno test, engine test bench, Pahl & Beitz
Subject : handling engine, dyno test, engine test bench, Pahl & Beitz

Engine test bench merupakan fasilitas yang dimiliki oleh PT. Mercedes-Benz Indonesia, digunakan sebagai tempat untuk menguji kinerja maksimal dari torsi dan daya yang dihasilkan oleh engine dengan menggunakan dyno test sebagai alat ukur nya. Dalam prosesnya, engine dibawa dari ruang perakitan menuju engine test bench menggunakan sebuah troli sederhana. Kemudian dipindahkan ke test-cell engine test menggunakan sebuah alat angkat (crane) dengan 3 langkah kerja, yaitu pengikatan, pengangkatan dan pemindahan. Proses ini membutuhkan waktu sekitar 121 detik. Dengan kondisi tersebut, perusahaan menilai perlu adanya penyempurnaan untuk mereduksi setting time, mengurangi risiko kecelakaan kerja, dan mengurangi beban kerja dari operator. Langkah yang akan dilakukan adalah dengan menghilangkan penggunaan crane yang dianggap belum efisien dalam penanganan engine. Tujuan dari tugas akhir ini adalah melakukan perancangan alat handling engine tipe M274 untuk proses engine test. Prinsip kerja dari alat ini adalah troli yang berfungsi sebagai pembawa dan mentransfer engine ke test cell, sehingga tidak lagi membutuhkan crane. Metode yang digunakan dalam perancangan alat ini mengacu pada metode menurut Pahl dan Beitz yang terdiri atas tahap merencana (planning), perancangan konsep (conceptual design), pengwujudan rancangan (embodiement design) dan perancangan detail (detail design). Setelah melakukan metode dan proses penyelesaian, menghasilkan rancangan alat yang mampu mereduksi setting time dari 121 detik menjadi 85,67 detik (berukurang sekitar 29,1%), menghilangkan penggunaan crane dan mengurangi beban kerja dari operator. Kata Kunci: handling engine, dyno test, engine test bench, Pahl & Beitz.

Description Alternative :

Engine Test Bench is facility owned by PT Mercedes-Benz Indonesia, used as a place to test the performance of the maximum of torque and power generated by using a dyno test as a measurement tool. In the process, the engine was taken from the assembly hall towards the engine test bench using a simple trolley. Then moved to the test cell engine test using a crane with 3 steps, i.e the binding, the appointment, and the removal. This process takes about 121 seconds. Under these conditions, the company is assessing the need for improvement to reduce the setting time, reduce the risk of accidents, and reduce the workload of the operator. The steps that will be done is to eliminate the use of a crane which has not been considered efficient in handling engine. The purpose of this final project is doing the design of the tool handling engine type M274 to process engine test. The working principle of this tool is the trolley that serves as a carrier and transfer engine to the test cell, so no longer need the crane. Methods used in the design of this tool refer to the method according to Pahl and Beitz consisting of stage planning, conceptual design, embodiement design, and detail design. After the performing, the method and process of completion, resulting in the design tool that is able to reduce the setting time from 121 seconds to 85,67 seconds (about 29,1%), eliminating the use of the crane, and reduce the workload of the operator. Keywords: handling engine, dyno test, engine test bench, Pahl & Beitz.

Give Comment ?#(0) | Bookmark

PropertyValue
Publisher IDJBPTPPOLBAN
Organization
Contact NameHelmi Purwanti
AddressJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
CityBandung
RegionJawa Barat
CountryIndonesia
Phone022 201 3789 ext. 168, 169, 239
Fax022 201 3889
Administrator E-mailhelmi.purwanti@polban.ac.id
CKO E-mailhelmi.purwanti@polban.ac.id

Print ...

Contributor...

  • Pembimbing: Tria Mariz Arief, S.ST., M.T., Editor: Erlin Arvelina

Downnload...