Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2019

Analisa dan Perancangan Ulang Instalasi Listrik Kantin Pujasera Politeknik Negeri Bandung

Analysis and Re-Design of Electrical Installation of Pujasera Bandung State Polytechnic

Tugas Akhir, 013 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-20 08:33:08
Oleh : Harwindo Cahyana - 161321013 (harwindo.cahya@gmail.com )
Dibuat : 2020-03-20, dengan 4 file

Keyword : Design Electrical Installation, Drawing Documents, Pujasera.
Subjek : Perancangan Instalasi Listrik, Dokumen Gambar, Pujasera.

Pujasera merupakan salah satu kantin di Politeknik Negeri Bandung. Gedung ini mengalami kerusakan yang cukup parah karena kebakaran pada 11 April 2017. Perancangan instalasi listrik pada kantin Pujasera merupakan bagian penting dalam sistem instalasi kelistrikan, pada tahap ini semua kebutuhan yang mencakup aspek-aspek instalasi kelistrikan akan diperhitungkan, seperti kebutuhan jumlah titik lampu, beban-beban listrik yang digunakan, besar luas penampang kabel, sampai dengan besar rating pengaman yang dibutuhkan dan aspek-aspek lain yang berkenaan dengan instalasi kelistrikan. Oleh karena itu, diperlukan perancangan ulang instalasi listrik gedung dan menganalisis kondisinya. Perancangan dimulai dengan observasi gedung, dilanjutkan pengecekan, memahami instalasi listrik yang sudah terpasang, dan melakukan penggambaran sesuai kondisi gedung. Perhitungan dilakukan dengan menghitung berbagai aspek penunjang dari setiap ruangan, diantaranya luas ruangan, intensitas penerangan yang dibutuhkan, efisiensi dan iluminasi lampu. Selain itu, ditentukan pula pengaman dan luas penampang penghantar yang digunakan. Sehingga terciptanya sistem instalasi listrik yang aman dan efisien.

Deskripsi Alternatif :

Pujasera is one of the canteens at the Bandung State Polytechnic. This building suffered severe damage due to fires on April 11, 2017. Electrical design installation in Pujasera canteen are an important part of the electrical installation system, in this installation all requirements covering aspects of electrical installation will be taken into account, such as the need for the number of lights, electrical load used, cross-sectional area of the cable, and the required safety assessment and aspects - other aspects relating to electrical installations. Therefore, it is necessary to redesign the building's electrical installation and analyze its condition. The design starts with building observations, continues checking, understands the electrical installations that have been installed, and delineates according to the condition of the building. Calculations are carried out by calculating various supporting aspects of each room, including the area of the room, the intensity of lighting needed, efficiency and illumination of the lamp. In addition, it is also determined the safety and conductive cross-sectional area used. The results is the creation of a safe and efficient electrical installation system.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Yoseph Santosa, S.T., M.Eng.


    Pembimbing 2: Trisnawiyana, S.ST., M.Eng. , Editor: Muhammad Abdillah Islamy, S.Pd

Download...