Path: Top > Tugas Akhir - D3 > Jurusan Teknik Sipil > Program Studi Konstruksi Gedung > 2016

Perencanaan Galian Dalam Pada Pembangunan Gedung Apartement Landmark Residence

Deep Entretchment Planning On Landmark Residence Apartement Building Project

Tugas Akhir, 002 / 2016 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2017-08-01 15:40:42
Oleh : Hugo Adrianto - 121111046 & Khilman Darmawan (hugobros@rocketmail.com)
Dibuat : 2017-08-01, dengan 4 file

Keyword : Untuk perencanaan dewatering akan menggunakan metoda predrainage wellpoints system dengan diperoleh debit 914,5 liter/menit yang harus dipompa dariluas area galian dengan jumlah pompa 4 buah berkapasitas 250 liter/menit untuk memenuhi rencana penurunan muka air tanah.
Subjek : Planning to use the method predrainage dewatering wellpoints system retrieved 914.5 liters/min debit which must be pumped from the area occupied by the number of pump 4 pieces capacity 250 litres/min for fulfilling the plan of a decrease in the face of the ground water.

Pelaksanaan konstruksi basement tidak bisa dilepaskan dari pekerjaan galian tanah karena basement merupakanstruktur bangunan yang ada di bawah tanah. Salah satu proyek pembangunan yang menarik untuk kami angkat sebagai objek pembuatan tugas akhir terdapat pada proyek Apartement Landmark Residence. Proyek ini memiliki beberapa rumusan masalahya itu lokasi yang terletak di tengah kota Bandung yang padat, dimana sekelilingnya terdapat beberapa bangunan permanen, ditambah dengan tingginya muka air tanah (MAT = ±3.00m di bawah pemukaan tanah). Untuk mengatasinya, pekerjaan galian dalam akan rencanakan untuk menunjang pekerjaan struktur bawah khususnya pekerjaan basement. Perencanaan galian dalam yaitu merencanakan dinding turap dan dewatering dengan maksud untuk menyediakan ruang untuk pekerjaan basement. Dinding turap direncanakan untuk menunjang pekerjaan galian dalam terutama untuk menahan tekanan tanah agar tidak terjadi hal yang tidak diinginkan, sedangkan dewatering berfungsi untuk menurunkan muka air tanah terutama pada saat galian basement. Hasil perencanaan pekerjaan galian dalam diperoleh sruktur penahan tanah yaitu dinding turap kantilever beton bertulang(soldier pile) tanpa jangkar dengan diameter 1m & kedalaman 20,5m yang dapat menahan tekanan tanah di sekitar area proyek.Untuk perencanaan dewatering akan menggunakan metoda predrainage wellpoints system dengan diperoleh debit 914,5 liter/menit yang harus dipompa dariluas area galian dengan jumlah pompa 4 buah berkapasitas 250 liter/menit untuk memenuhi rencana penurunan muka air tanah.

Deskripsi Alternatif :

Implementation of the construction of a basement could not released from soil of excavation work because the basement is the structure of the existing building underground. One of the interesting development projects for our lift as the object of making the final assignment is present on the project Apartment Landmark Residence. This project has some problem formulation that is a location set amidst the hectic city of Bandung, where there are few permanent buildings around it, coupled with the high advance groundwater (MT = ± 3.00 m under the ground surface). To resolve it, the work plan will be occupied in order to support the work of the structure under the particular work of the basement. Excavation planning in that is planning a ground retaining walls and dewatering with the intent to provide a space for the work of the basement. Retaining walls are planned to support the work of the excavation in the soil to resist pressure especially from unwanted things happen, while dewatering serves to lower face of the groundwater excavation especially in the basement. The results obtained in the excavations and work planning the structure of the retaining wall (soldier pile) without an anchor with a diameter of 1 m & 20 m depth, that can withstand the pressure of the soil around the project area. Planning to use the method predrainage dewatering wellpoints system retrieved 914.5 liters/min debit which must be pumped from the area occupied by the number of pump 4 pieces capacity 250 litres/min for fulfilling the plan of a decrease in the face of the ground water.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing : Krish Madhyono, H., Dilp.Ing.HTL., MT, Editor: Erlin Arvelina

Download...