Studi Kebutuhan daya Listrik di Hotel Sakti bandung

STudy of Electrical Power Needs in Sakti Hotel Bandung

Undergraduate Theses from JBPTPPOLBAN / 2020-03-24 09:45:34
Oleh : Ifsyal Defriana Putra - 161321043 (defriana_ifsyal@yahoo.co.id )
Dibuat : 2020-03-24, dengan 4 file

Keyword : Characteristics of electrical load, electrical power requirements.
Subjek : Karakteristik beban listrik, Kebutuhan daya listrik.

Hotel Sakti merupakan salah satu hotel yang terdapat di kota bandung yang bersifat komersial. Hotel ini terdapat 13 lantai yaitu lantai semi basement dan dua belas lantai utama. Daya listrik terpasang di hotel sakti bandung yang disuplai dari PLN sebesar 690 KVA, dengan satu buah transformator berkapasitas sebesar 1.000 KVA dan satu buah generator – set yang berkapasitas sebesar 670 KVA. Besarnya daya listrik yang terpasang masih perlu dievaluasi kembali untuk tercapainya sistem perancangan distribusi daya listrik yang baik dari sistem kelistrikannya, suplai daya listrik maupun cadangan dayanya. Studi ini melakukan perhitungan ulang kebutuhan daya listrik dengan menggunakan metode faktor – faktor karakteristik beban listrik terdapat pada IEC 60439. Hasil analisis dan perhitungan diperoleh beban terpasang 572.853 VA, daya yang terpakai pada kapasitas transformator sebesar 57,28% sedangkan daya yang terpakai pada kapasitas generator – set sebesar 59,14%. Jadi kondisi tersebut masih dapat mensuplai daya listrik ke beban terpasang di hotel sakti bandung.

Deskripsi Alternatif :

Hotel Sakti is one of the hotels in the commercial city of Bandung. The hotel has 13 floors, which are semi basement floors and twelve main floors. Electricity installed at the Sakti Hotel Bandung supplied by PLN is 690 KVA, with one transformer with a capacity of 1,000 KVA and one generator - set with a capacity of 670 KVA. The amount of installed electric power still needs to be reevaluated to achieve a good electrical power distribution design system from the electrical system, electric power supply and power reserves. This study recalculates electrical power requirements using the method of electric load characteristics factors found in IEC 60439. The results of analysis and calculations obtained installed load of 572,853 VA, the power used in transformer capacity is 57.28% while the power used in generator capacity - set of 59.14%. So these conditions can still supply electrical power to the load installed at the Sakti Hotel Bandung.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id