Rancang Ulang Instalasi Listrik Penerangan Lantai 1 Sampai 3 di Hotel Arya Duta Bandung

Re-Designing Lighting Electrical Installation Florr 1 to 3 at Hotel Arya Duta

Tugas Akhir, 014 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-20 08:38:23
Oleh : Ikhsan Fajar Muharam - 161321014 (fajarikhsan347@gmail.com )
Dibuat : 2020-03-20, dengan 4 file

Keyword : Redrawing Installation, Drawing Documents, Bill of Quantity, lighting electricity installation calculations.
Subjek : Menggambar Ulang Instalasi, Dokumen Gambar, Bill of Quantity, perhitungan instalasi listrik penerang

Hotel ARYA DUTA merupakan hotel bintang lima dan memiliki fasilitas yang beragam, hotel ini membutuhkan gambar instalasi listrik sehingga ketika terjadi gangguan listrik akan mudah dalam pelacakan dan perbaikan serta memudahkan ketika akan melakukan perawatan. Setelah melakukan observasi dan pengukuran lalu melakukan analisa pencahayaan, diperoleh bahwa instalasi listrik penerangan terpasang belum memenuhi standar dan persyaratan PUIL 2011 dan SNI 2011. Oleh karena itu penulis akan merancang ulang instalasi listrik penerangan di hotel ARYA DUTA. Selain itu juga, pemasangan instalasi listriknya harus mengacu kepada prinsip instalasi listrik yang baik dan sesuai standar PUIL 2011. Merancang ulang dimulai dengan observasi terlebih dahulu, kemudian dilanjutkan pengecekan, memahami instalasi listrik yang sudah terpasang, dan menghitung pencahayaan setiap ruangan sesuai fungsi. Perhitungan dilakukan dengan menghitung berbagai aspek penunjang dari setiap ruangan, diantaranya luas penampang penghantar, rating pengaman, luas ruangan, intensitas penerangan yang dibutuhkan. Selain itu juga, dilakukan perhitungan Bill of Quantity. Dari hasil rancang ulang instalasi listrik penerangan di peroleh dokumen gambar dan rekomendasi hasil perhitungan instalasi listrik penerangan.

Deskripsi Alternatif :

Hotel is a five-star hotel and has a variety of facilities, this hotel requires electrical installation drawings so that it will facilitate repair and repairs as well as facilitate compilation of maintenance. After observing and measuring and then analyzing the lighting, it was obtained that the installed electrical lighting installation did not meet PUIL 2011 and SNI 2011 standards and requirements. Therefore an approval was proposed to reinstall the lighting electricity installation at the ARYA DUTA hotel. In addition, the installation of electrical installations must also be installed on the principle of good electrical installation and in accordance with the 2011 PUIL standards. Redesigning starts with observation first, then starts checking, starts the electrical installation that is already installed, and repairs the installation as needed. The assessment is carried out by calculating all supporting aspects of each room, evaluating the cross-sectional area of the conductor, assessing the security, the area of the room, the intensity of the lighting needed. In addition, the Bill of Quantity is calculated. From the results of the redesign of the electrical lighting installation obtained image documents and evaluation of the results of the electrical lighting installation.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Abdullah Asegaf, M.T.


    Pembimbing 2: Yoseph Santosa, S.T., M.Eng.

    , Editor: Muhammad Abdillah Islamy, S.Pd

Download...