Analisis Rencana Anggaran Biaya Pelaksanaan Dan Penjadwalan Pada Pekerjaan Struktur Gedung Fakultas Farmasi Unjani

Budget Plan Analysis For Implementation And Scheduling On Structural Work Faculty Of Pharmacy Unjani Building

Tugas Akhir, 011 / 2021 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2022-05-30 10:42:44
By : Kethlin Zaneta - 181111016 & Saskia Salsabila Ainun - 181111026 (kethlin.zaneta.tkgd18@polban.ac.id )
Created : 2022-05-30, with 4 files

Keyword : Real Cost Budget Plan, Scheduling.
Subject : Rencana anggaran biaya pelaksanaan, penjadwalan.

Proyek Gedung Fakultas Farmasi UNJANI adalah proyek yang dibangun dengan tujuan untuk memenuhi fasilitas belajar mengajar dan meningkatkan kenyamanan bagi mahasiswa. Dalam proses pelaksanaan proyek maka dibutuhkan manajemen konstruksi yang efektif sehingga dapat memaksimalkan pekerjaan pelaksanaan di konstruksi. Salah satu yang harus diperhatikan dalam manajemen konstruksi adalah Rencana Anggaran Biaya Pelaksanaan dan Penjadwalan yang baik guna memanfaatkan sumber daya di proyek dengan baik. Untuk menghitung rencana anggaran biaya pelaksanaan dan penjadwalan proyek dibutuhkan shop drawing, metode pelaksanaan, RKS dan harga satuan bahan dan upah. Dalam melakukan kegiatan perhitungan ada beberapa hal yang harus dihitung yaitu work breakdown structure, volume pekerjaan, analisa harga satuan pekerjaan, daftar harga satuan, dan produktivitas. Sedangkan dalam penyusunan penjadwalan hal yang harus dilakukan yaitu perhitungan durasi. Dalam kegiatan penjadwalan proyek membutuhkan software untuk membantu penyusunan antara lain yaitu Microsoft Office Project. Berdasarkan hasil perhitungan, besar rencana anggaran biaya pelaksanaan struktur Gedung Fakultas Farmasi UNJANI didapatkan senilai Rp. 26.656.989.732,00 dengan profit 16%. Dan berdasarkan hasil perencanaan penjadwalan proyek ini akan dilaksanakan selama 322 hari dengan 7 hari kerja dalam seminggu dan 1 hari kerja dalam 8 jam Kata.

Description Alternative :

Faculty of pharmacy's UNJANI building project is a project to fulfill teaching and learning facilities and increase comfort for students. In the project implementation process, effective construction management is required. It can maximize the implementation work in construction. One thing that should be part of the consideration in construction management is the implementation budget plan and good scheduling to make good use of the resources in the project. To calculate the budget plan for implementation and project scheduling, require some shop drawings, implementation methods, work plans and terms and conditions, and unit prices for materials and wages. In carrying out calculation activities several things must be calculated, such as work breakdown structure, work volume, work unit price analysis, unit price list, and productivity. Meanwhile, in the preparation of the schedule, the thing that should be done is the calculation of the project duration. In project scheduling activities, the software needed to assist in the preparation, including Microsoft Office Project. Based on the calculation results, the planned budget for the implementation process of the Faculty of Pharmacy UNJANI structure was Rp. 26.656.989.732,00 with a profit of 16%. And based on the results, this project's scheduled planning will carry out for 322 days with seven working days in eight hours.

Give Comment ?#(0) | Bookmark

PropertyValue
Publisher IDJBPTPPOLBAN
Organization
Contact NameErlin Arvelina
AddressJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
CityBandung
RegionJawa Barat
CountryIndonesia
Phone022 201 3789 ext. 168, 169, 239
Fax022 201 3889
Administrator E-mailerlin.arvelina@polban.ac.id
CKO E-mailerlin.arvelina@polban.ac.id

Print ...

Contributor...

  • Pembimbing 1: Drs. Yulianto P.K., M.M.


    Pembimbing 2: Muchtar, S.ST., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Downnload...