Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perawatan & Perbaikan Gedung > 2013

KAJIAN OPERATION, MAINTENANCE AND REPAIR DITINJAU DARI ARSITEKTURAL, STRUKTURAL, MEKANIKAL, ELEKTRIKAL DAN TATA LINGKUNGAN PADA GEDUNG KULIAH C POLBAN

STUDY OF OPERATION, MAINTENANCE AND REPAIR BASED ON ARCHITECTURE, STRUCTURAL, MECHANICAL, ELECTRICAL AND ENVIRONMENTAL GOVERNANCE IN COLLEGE BUILDING C POLBAN

Tugas Akhir, 006 / 2013 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:55
Oleh : Mochamad Indra Perdana - 091144015 (indraperdana@yahoo.com)
Dibuat : 2016-02-09, dengan 4 file

Keyword : Operation Maintenance Repair, Initial Cost, kuisioner
Subjek : Operation Maintenance Repair, Initial Cost, Questionnaire

Gedung Kuliah 1 atau Gedung C merupakan salah satu bangunan yang didirikan pada tahun 1982 di Politeknik Negeri Bandung. Pada gedung pemerintah umur bangunan ialah selama 50 tahun, gedung ini telah berdiri selama 31 tahun, maka gedung ini memiliki sisa umur masa layan selama 19 tahun lagi, untuk mengoptimalkan masa layan tersebut diperlukanlah perawatan dan perbaikan yang terjadwal dan tersusun, baik teknis maupun biaya yang diperlukan. Laporan tugas akhir ini membahas mengenai kajian operasional perawatan dan perbaikan pada gedung kuliah C Politeknik Negeri Bandung berdasarkan elemen elemen utama bangunan yaitu Arsitektural, Struktural, Mekanikal, Elektrikal, dan Tata Lingkungan (ASMET). Pada pembahasan laporan ini penulis menggunakan kuisioner yang didasarkan pada aspek ASMET yang disebar ke pengguna gedung ini. Pada laporan ini terdapat pembahasan mengenai biaya perawatan perbaikan yang diperlukan selama gedung ini berdiri dengan menggunakan pendekatan Initial Cost (IC), beserta beberapa kajian struktur, toilet dan Standard Operasional Prosedure (SOP) Dari hasil pembahasan kuisioner dan observasi lapangan yang disebar, terdapat beberapa komponen yang perlu diganti dan diperbaiki diperkirakan sebesar Rp 195,253,840.99 (penggunaan cat dan waterproofing biasa), dan biaya perawatan pada tahun 2013 ialah sebesar Rp 73.936.045,24 dengan menggunakan pendekatan Initial Cost. Terdapat kerusakan pada selasar yaitu rembesan air dan setelah di lakukan pengujian didapat mutu beton selasar sebesar 44.6 Mpa telah mengalami penurunan kekuatan sebesar 20-30 %. Berdasarkan hasil pengukuran elevasi penggunaan waterpass terdapat perbedaan elevasi struktur pada gedung ini, hal ini dapat dikarenakan beberapa factor. Maintenance checklist dan SOP Kuliah C ini diharapkan dapat digunakan pada gedung lain yang sama di Politeknik Negeri Bandung. Kata kuci : Operation Maintenance Repair, Initial Cost, kuisioner

Deskripsi Alternatif :

College Building 1 or Building C is one of the buildings that was built in 1982 in Bandung State Polytechnic. Age of the building government in indonesian designed for 50 years, this building has been used for 31 years, the building has a remaining life of 19 year service, to optimize the remaining life of the building, requires maintenance and scheduled repairs, both technical and cost necessary. This final report study the operational maintenance and repairs on buildings Bandung State Polytechnic college C based on main elements, Architecturally, Structural, Mechanical, Electrical, and Environmental Management (ASMET). In the discussion the authors report using a questionnaire that was based on ASMET aspects that spread to the building's users. On this report contained regarding the necessary corrective maintenance costs during the building stands using approach Initial Cost (IC), along with a review of structure, toilet and Standard Operating Procedure (SOP). Study of the results questionnaires and field observations are deployed, there are several components that need to be replaced and repaired estimated at Rp 195,253,840.99 (use regular paint and waterproofing), and the cost of care in 2013 is Rp 73,936,045.24 by using the Initial Cost approach. There is damage to the breezeway water seepage and after doing the test obtained in the quality of concrete breezeway at 44.6 MPa strength has decreased by 20-30%. Based on the results of the use of elevation measurements Waterpass elevation differences in the structure of the building, this can be due to several factors. Maintenance checklist and SOP Class C is expected to be used in other similar buildings in Bandung State Polytechnic. Key Word : Operation Maintenance Repair, Initial Cost, Questionnaire

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Yulianto P.K., Drs., MM., Editor: Erlin Arvelina

Download...