Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Mesin > Program Studi Proses Manufaktur > 2018

Teknologi Perencanaan Proses Pembuatan Komponen Front Door Handle

Manufacturing Process Planning Technology Of Front Door Handle Component

Skripsi, 015 / 2018 / PMA
Undergraduate Theses from JBPTPPOLBAN / 2019-01-15 12:01:36
Oleh : Muhamad Fikri Nurochman - 141244017 (muhamadfikri1506@gmail.com)
Dibuat : 2019-01-15, dengan 4 file

Keyword : Teknologi Perencanaan Proses, Konsep sistem dan bentul alat bantu, Waktu
Subjek : Process Planning Technology, System Concept and helper, Time

PT. Pindad Enjiniring Indonesia mempunyai strategi make to order sehingga didalam aktivitasnya mempunyai kegiatan produksi yang berbeda-beda dengan parameter-parameter proses pemesianan, parameter ini diambil pada pembuatan komponen Release Plate, Carrier Arm dan Padlock pada proyek front door handle yang sebelumnya dibuat di mesin konvensional tanpa adanya perencanaan proses sehingga pekerjaan dibebankan kepada operator hal ini menunjukan bahwa di PT. Pindad Enjiniring Indonesia tidak ada komunikasi antara engineering dengan operator. Untuk mengatasi permasalahan tersebut, dilakukan suatu metologi yang disesuaikan dengan kebutuhan tertentu. metodologi tersebut adalah menggunakan teknologi perencanaan proses dengan output berupa working plan dengan alat bantu untuk meempermudah proses pengerjaan produksi. Hasil tugas akhir ini adalah berupa working plan yang dapat menjadi solusi sebagai sarana komusikasi bagian engineering dengan operator. Kata kunci: Teknologi Perencanaan Proses, Konsep sistem dan bentul alat bantu, Waktu.

Deskripsi Alternatif :

PT. Pindad Enjiniring Indonesia have make to order strategy, therefore they have different production activity with the other parameter of machining process, this parameter taken from Release Plate, Carrier Arm, and Padlock component at front door handle project which have been made from conventional machine without any process planning, so the operator had to handle those loadwork. This showing that PT. Pindad Enjiniring Indonesia have no communication between engineering and operator. To solve that problem, a methodology is used which suited with the needs. The methodology is using Process Planning Technology. The output from the methodology is a working plan with helper to make production process easier than before. The result of this final tasks is a working plan that can be used as solution for communication between engineering and operator. Keywords: Process Planning Technology, System Concept and helper, Time.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Achmad Hatta, B.Eng., M.Eng.

    Pembimbing 2: Kusino, Editor: Erlin Arvelina

Download...