Print ...

Kontributor...

  • Pembimbing 1: Yoseph Santosa, S.T., M.Eng.


    Pembimbing 2: Bambang Priyandono, S.ST., M.Pd., M.T. , Editor: Muhammad Abdillah Islamy, S.Pd

Download...

Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2019

Analisa Sistem Proteksi Hubung Singkat dan Beban Lebih Instalsai Listrik di Lantai 2 Gedung Direktorat

Analysis of Electrical Short Circuit and Overload Instalation Protection System in Directorate Building Floor 2 Polban

Tugas Akhir, 021 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-20 10:21:31
Oleh : Muhammad Idris Anshorullah - 161321022 (muh.idris34@gmail.com )
Dibuat : 2020-03-20, dengan 4 file

Keyword : Building Installation Protection System, Short Circuit Protection, Overload Protection, Miniature Circuit Breaker, MCB
Subjek : Sistem Proteksi Instalasi Gedung, Proteksi Hubung Singkat,Proteksi Beban Lebih, Miniature Circuit Breaker, MCB

Pada pemasangan instalasi listrik, pengamanan instalasi adalah suatu hal yang sangat penting, instalatir saat memasang instalasi harus memperhitungkan berapa besar energi listrik yang di gunakan pada ruang tertentu dan peralatan proteksi yang cocok untuk sistem instalasinya. Tentu saja dalam menentukan peralatan instalasi, komponen instalasi, dan peralatan proteksi, harus memenuhi standar yang ada di Indonesia, standar yang berlaku untuk sebuah instalasi tegangan rendah adalah standar PUIL 2011 (Persyaratan Umum Istalasi Listrik). Pada gedung direktorat lantai 2 di POLBAN terjadi kebakaran yang disebabkan oleh hubung singkat, dan mayoritas dari penyebab hubung singkat adalah ketidak selarasan antara proteksi yang terpasang dengan KHA kabel yang digunakan. Setelah dilakukannya analisa di lapangan nilai dari arus nominal MCB yang terpasang ada pengaman dan kabel yang tidak sesuai dengan besarnya arus yang digunakan.

Deskripsi Alternatif :

In the installation of electrical installations, securing the installation is a very important thing, the installer when installing the installation must take into account how much electrical energy is used in a particular room and protective equipment suitable for the installation system. Of course in determining installation equipment, installation components, and protective equipment, it must meet existing standards in Indonesia, the standard applicable to a low voltage installation is PUIL 2011 (General Electrical Installation Requirements). In the 2nd floor directorate building at POLBAN there was a fire caused by a short circuit, majority that caused short circuit was a misalignment between the protection attached to the current that cable cabel can sustained. After conducting an analysis in the field, the value of the nominal current of MCB and cables that installed are not match with the amount of current used on field.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id