Path: Top > Tugas Akhir - D3 > Jurusan Teknik Sipil > Program Studi Konstruksi Gedung > 2016

Analisis Dan Kebutuhan Peningkatan Kinerja Struktur Masjid Lukmanul Hakim Politeknik Negeri Bandung Berdasarkan Sni 1726:2012

Structural Analysis And Performance Improvement Requirements Of Masjid Lukmanul Hakim Politeknik Negeri Bandung Based On Sni 1726:2012

Tugas Akhir, 004 / 2016 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2017-08-01 15:31:23
Oleh : Nizar Ghifari Fajrian - 131111051 & M. Dzikri Ridwanulloh - 131111047 (nizarghifarifajrian@gmail.com )
Dibuat : 2017-08-01, dengan 4 file

Keyword : Analisis, Bracing, Gempa, Kinerja, Peningkatan
Subjek : Analysis, Bracing, Earthquake, Performance, Improvement

ABSTRAK Perubahan peraturan struktur tahan gempa dari PPKGURG-1987 menjadi SNI 1726:2012 memberi perubahan prosedur desain yang cukup besar terhadap desain struktur bangunan. Masjid Lukmanul Hakim yang dibangun pada tahun 1995 didesain berdasarkan PPKGURG-1987, maka diperlukan analisis berdasarkan SNI 1726:2012 untuk mengetahui dibutuhkan atau tidaknya suatu peningkatan kinerja pada bangunan tersebut. Desain berdasarkan SNI 1726:2012 menghasilkan kemungkinan gaya-gaya dalam dan reaksi perletakan yang lebih besar. Maka peningkatan kinerja terhadap struktur bangunan didesain dengan menggunakan baja bracing yang dipasang pada ke empat sisi bangunan. Efek dari baja bracing menghasilkan kekakuan yang lebih besar dan mengurangi beban gempa yang ditahan oleh rangka beton bangunan existing. Kata Kunci : Analisis, bracing, gempa, kinerja, peningkatan

Deskripsi Alternatif :

ABSTRACT The changes in code of earthquake-resistant structures from PPKGURG-1987 to SNI 1726:2012 gives a considerable design procedure on the structural building design. Masjid Lukmanul Hakim which built in 1995 was design based on PPKGURG-1987, therefore an analysis based on SNI 1726:2012 is required to determine whether or not an improvement of performance of the building. The design provision of SNI 1726:2012 results a probably greater element forces and support reaction. Therefore improvement on the structural performance of the building is designed using steel braces constructed at four sides of the building. The effect of the steel braces are greater stiffness and reduced the seismic forces retained by the concrete frames of the existing building. Keywords: Analysis, bracing, earthquake, performance, improvement

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing : Dr., Ir., Riawan Gunadi,. Msc.

    Pembimbing II :Muchtar., SST., MT, Editor: Erlin Arvelina

Download...