Path: Top > Tugas Akhir - D3 > Jurusan Teknik Sipil > Program Studi Konstruksi Sipil > 2014

Metoda Pelaksanaan Konstruksi, Perhitungan Rencana Anggaran Pelaksanaan, Dan Alokasi Sumber Daya Pekerjaan Box Culvert 4,9x3,1 M Cast In Situ Di Maindrain Cihuni STA 1+895~2+475-Bumi Serpong Damai, Tangerang

Method Of Construction Implementation, Calculation Of The Budget Implementation Plan, And Resources Allocations Of Operation Box Culvert 4,9x3,1 M Cast In Situ At Maindrain Cihuni STA 1+895~2+475-Bumi Serpong Damai, Tangerang

Tugas Akhir, 018 / 2014 / KSI
Undergraduate Theses from JBPTPPOLBAN / 2018-04-12 15:06:08
Oleh : Nur Bakhrul 'Ilmi – 111121024 & Sarah Catherine Shiella - 111121058 (s.catherineshiella@yahoo.com)
Dibuat : 2018-04-12, dengan 4 file

Keyword : metoda pelaksanaan, biaya, waktu, jadwal, sumber daya
Subjek : implementation method, cost, time, schedule, resources

Kota Tangerang yang bersebelahan dengan Kota Bogor seringkali terkena dampak luapan air dan banjir akibat dari curah hujan yang tinggi, padatnya pemukiman penduduk serta minimnya fungsi saluran drainase. Oleh sebab itu pihak BSD City merencanakan adanya pembangunan infrastruktur berupa Maindrain Box Culvert di kawasan BSD City. Namun pekerjaan Box Culvert 4,9x3,1 m Cast In Situ di Maindrain Cihuni STA 1+895~2+475-Bumi Serpong Damai, Tangerang ini mengalami keterlambatan. Untuk mencegah dan mengatasi keterlambatan suatu pekerjaan konstruksi, diperlukan menyusun metoda pelaksanaan konstruksi agar setiap item pekerjaan berjalan efektif dan efisien, menghitung rencana anggaran pelaksanaan yang baik dan tepat agar proyek tidak mengalami kerugian, serta penjadwalan dan pengalokasian sumber daya secara efisien agar tidak kelebihan waktu maupun sumber daya yang dapat memengaruhi penyelesaian proyek. Pada pekerjaan Cast In Situ Box Culvert 4,9x3,1 m STA 1+897 s/d 2+475 di Maindrain Cihuni, BSD ini metoda pelaksanaan yang digunakan yaitu dengan membagi pekerjaan menjadi 5 bagian, yaitu pekerjaan persiapan, pekerjaan pengukuran, pembuatan box culvert, bak kontrol, dan pekerjaan pembersihan akhir. Rencana Anggaran Pelaksanaan (RAP) pekerjaan Cast In Situ Box Culvert 4,9x3,1 m STA 1+897 s/d 2+475 di Maindrain Cihuni, BSD ini membutuhkan biaya total Rp 8.131.575.441,28. Durasi pekerjaan sesuai dengan kontrak dilakukan selama 94 (sembilan puluh empat) hari kerja yang berlangsung dari 24 Juni 2013 sampai dengan 9 Oktober 2013. Kata kunci: metoda pelaksanaan, biaya, waktu, jadwal, sumber daya.

Deskripsi Alternatif :

Tanggerang city placed after Bogor city almost suffers the effect of flood caused by high rain intensity, denseness the residential area, and lack of drainage. BSD city, thus, has been planning to establish infrastructure "Maindrain Box Culvert" in BSD city area. However, the process of establishing Box Culvert 4,9x3,1 m Cast In Situ in Maindrain Cihuni STA 1+895~2+475-Bumi Serpong Damai, Tangerang, has not been done on schedule. To restrain and solve the retardation the costruction process, it needs to plan a construction work plan to make all the items of work can be running effectively and efficiently, to well and appropriately calculate the processing cost to make the project not losing cost, and to plan and allocate the resources efficiently to make the process running on the schedule. In processing Cast In Situ Box Culvert 4,9x3,1 m STA 1+897 s/d 2+475 in Maindrain Cihuni, BSD, the method used is parting the process in 5 sessions; there are preparation, calculating process, box culvert making, controlling basin, and cleaning process. The implementation of the budget plan of Cast In Situ Box Culvert 4,9x3,1 m STA 1+897 s/d 2+475 in Maindrain Cihuni, BSD needs the total cost Rp 8.131.575.441,28. The working duration is based in the contract; working for 94 days starting from June 24th 2013 until October 9th 2013. Keywords: implementation method, cost, time, schedule, resources.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. RR. Elisabeth Marlailana, M.T., Editor: Erlin Arvelina

Download...