Pra-Rancangan Pabrik Metanol dengan Proses Lurgi menggunakan Katalis Tembaga Kapasitas 330.000 Ton/Tahun

Preliminary Design of Methanol Plant by Lurgi Process Using Copper Catalyst Capacity of 330.000 Ton/Year

Tugas Akhir, 006 / 2013 / KPB-PPL
Undergraduate Theses from JBPTPPOLBAN / 2017-02-23 09:41:29
Oleh : Nurul Afifah - 121427015 & Muhamad Irawan Setiadi - 121427019 (noey_oenuy@yahoo.com; jibers_iraone@yahoo.com)
Dibuat : 2017-02-23, dengan 1 file

Keyword : Metanol, metoda Lurgi, pabrik metanol, analisa ekonomi
Subjek : methanol, Lurgi method, methanol plant, the economic analysis

Metanol merupakan bentuk alkohol yang paling sederhana dan banyak digunakan dalam industri kimia, antara lain industri cat, industri farmasi, industri plastik, dan sebagai energi alternatif. Prarancangan pabrik metanol dengan proses Lurgi menggunakan katalis tembaga dengan kapasitas 330.000 ton/tahun dimaksudkan untuk memenuhi kebutuhan metanol yang semakin meningkat dan untuk mengurangi impor metanol. Pabrik metanol direncanakan dibangun di atas tanah seluas 4 ha di Kawasan Industri Kujang Cikampek, Jawa Barat. Pabrik beroperasi selama 8000 jam per tahun. Jumlah kebutuhan tenaga kerja sebanyak 106 orang. Metanol dibuat dari proses Lurgi dengan katalis CuO pada suhu 250oC dan tekanan 80 atm dalam reaktor Multitubuler Reaktor. Reaksi berlangsung secara eksotermis . Bahan baku yang dibutuhkan adalah CO2 dan H2 perbandingan 1:3 dengan konversi sebesar 84% mol. Produk metanol yang dihasilkan memiliki kemurnian 99% berat. Kebutuhan utilitas meliputi air sungai sebanyak 18908,64 m3/tahun, 957808,5 steam ton/tahun dan kebutuhan listrik sebesar 872511,55 kW/tahun. Bentuk perusahaan yang dipilih adalah perseroan terbatas (PT) dengan struktur organisasi line and staff. Sistem kerja karyawan berdasarkan pembagian jam kerja yang terdiri atas karyawan shift dan non-shift. Hasil analisis ekonomi terhadap perancangan pabrik metanol diperoleh modal tetap fixed capital investment (FCI) sebesar Rp 229.463.269.414. Dari hasil perhitungan evaluasi ekonomi didapat keuntungan setelah pajak 5% sebesar Rp. 906.235.699.425/tahun. Nilai titik impas atau break event point (BEP) sebesar 52%, waktu yang diperlukan untuk mengembalikan investasi awal atau pay back period (PBP) adalah 2,13 tahun. Syarat didirikannya suatu pabrik adalah jika nilai BEP 40%-60%, itu berarti pabrik metanol yang dirancang dengan kapasitas 330.000 ton/tahun layak untuk didirikan. Kata Kunci: Metanol, metoda Lurgi, pabrik metanol, analisa ekonomi.

Deskripsi Alternatif :

Methanol is the simplest form of alcohol and widely used in the chemical industry, such as paint industry, pharmaceutical industry, plastic industry, and as alternative energy. Preliminary design of methanol plant by Lurgi process using copper with capacity of 330,000 tons/year is intended to meet the growing needs of methanol and to reduce import. Methanol plant to be built on the land area of 4 ha in Kawasan Industri Kujang Cikampek, West Java. The factory operates 8000 hours per year. The number of workforce need of 106 people. Methanol is made by Lurgi Process with CuO catalyst at a temperature of 250oC and a pressure of 80 atm in a Multitubuler Reactor. The reaction takes place exothermic . The raw material required is CO2 dan H2, ratio 1:3 with a conversion of 84% mol. The resulting product has a purity of 99% by weight methanol. Utilities consist of water of 18908,64 m3/year, steam of 957808,5 tons / year and electricity demand of 872511,55 kW/year. The selected firm form a limited liability company (PT), with line and staff organizational structure. System of employee work hours based on the work distribution consist of shift and non-shift employee. The results of economic analysis to the design acquired fixed capital of Rp 229.463.269.414. From the economic analysis, the profit after tax obtained of about 5% is Rp 906.235.699.425/year. The break event point to build a feasible plant is 52 %, the pay back period of 2,13 years. The prerequirement to build a feasible plant is the break event point value of 40%-60%. So that, this methanol plant with the capacity about 330.000 ton/years is feasible to be build. Keywords: methanol, Lurgi method, methanol plant, the economic analysis.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. Heriyanto, MT., Editor: Erlin Arvelina

Download...