Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2021

Penerapan BIM Pada Struktur Atas Gedung Pelayanan Pemerintah Polres Bekasi

Implementation of BIM in The Structure of The Bekasi Police Government Service Building

Tugas Akhir, 015 / 2021 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2022-06-13 09:53:38
By : Praditya Muhamad Setiawan - 181111022 (praditya.muhamad.tkgd18@polban.ac.id )
Created : 2022-06-13, with 4 files

Keyword : Building Information Modelling (BIM), Tekla Structures
Subject : Building Information Modelling (BIM), Tekla Structures

Penerapan Building Information Modelling (BIM) dengan Tekla Structures akan mendapatkan informasi yang terintegrasi sehingga diperoleh hasil yang optimal dalam pemodelan strukturnya. Prinsip dasar dari konsep ini adalah menggunakan model 3D untuk memperoleh gambar dan output dari pemodelan. Harapannya, dengan menggunakan aplikasi Tekla Structures dapat menghasilkan pemodelan dan quantity dari struktur bangunan yang dibuat. Proses pemodelan dari aplikasi Tekla Structures dilakukan dengan Modelling Parts dan Detailing yang mana mengacu kepada proyek untuk gambar kerjanya. Proses perbandingan BoQ terlebih dahulu dikeluarkan hasil dari Tekla Structures dan dihitung dengan cara manual yang mana mengacu pada gambar kerja proyek. Hasil perbandingan antara BoQ manual dengan BoQ yang di hasilkan Tekla Structures, bahwa perbandingan mutu beton K-300 memiliki presentase perbedaan 8 %, K-350 dengan perbedaan 10,4%, tulangan ulir U39 dengan perbedaan 3,69%, tulangan polos U24 dengan perbedaan 13,27%, bekisting pelat lantai dengan perbedaan 0,14%, bekisting balok dengan perbedaan 6,69% dan bekisting kolom dengan perbedaan 1,93%.

Description Alternative :

The application of Building Information Modeling (BIM) with Tekla Structures will obtain integrated information so that optimal results are obtained in the modeling of the structure. The basic principle of this concept is to use 3D models to obtain images and output from the modeling. The hope is, by using the Tekla Structures application, you can produce modeling and quantity of the building structures that are made. The modeling process of the Tekla Structures application is carried out with Modeling Parts and Detailing which refers to the project for its working drawings. The results of the BoQ comparison process are first extracted from Tekla Structures and also calculated manually by referring to the project working drawings. The results of the comparison between manual BoQ and BoQ produced by Tekla Structures, that the comparison of concrete quality K-300 has a percentage difference of 8%, K-350 with a difference of 10.4%, U39 reinforcement with a difference of 3.69%, U24 reinforcement with a difference of 13.27%, floor slab formwork with a difference of 0.14%, beam formwork with a difference of 6.69% and column formwork with a difference of 1.93%.

Give Comment ?#(0) | Bookmark

PropertyValue
Publisher IDJBPTPPOLBAN
Organization
Contact NameErlin Arvelina
AddressJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
CityBandung
RegionJawa Barat
CountryIndonesia
Phone022 201 3789 ext. 168, 169, 239
Fax022 201 3889
Administrator E-mailerlin.arvelina@polban.ac.id
CKO E-mailerlin.arvelina@polban.ac.id

Print ...

Contributor...

  • Pembimbing 1: Heri Kasyanto, S.T., M.Eng.


    Pembimbing 2: Drs. Yulianto P.K., M.M., Editor: Muhammad Abdillah Islamy, S.Pd

Downnload...