Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Refrigerasi & Tata Udara > Program Studi Teknik Pendingin & Tata Udara > 2019

Analisis Audit Konsumsi Energi Sistem Tata Udara (Chiller, Cooling Tower, AHU) Di Gedung Bandung Electronic Center

Audit Analysis Of Energy Consumption For Air Conditioning System (Chiller, Cooling Tower, Ahu) At Bandung Electronic Center Building

Skripsi, 025 / 2019 / PTU
Undergraduate Theses from JBPTPPOLBAN / 2020-06-29 15:34:02
Oleh : Rifa Muzakkiyatul Hasanah - 151624026 (rifamuzakkia61@gmail.com)
Dibuat : 2019-12-19, dengan 4 file

Keyword : sistem tata udara, audit energi, kelayakan, kenyamanan
Subjek : air conditioning system, energy audit, feasibility, comfort

Sistem tata udara merupakan teknologi untuk pengondisian udara sesuai dengan temperatur dan kelembaban yang dibutuhkan, memiliki peran yang sangat penting dalam meningkatkan kenyamanan penghuni didalamnya. Pada Mall Bandung Electronic Center (BEC) sistem tata udara yang diaudit adalah dua unit water colled chiller, dua unit cooling tower, dan 19 air handling unit (AHU) untuk mendinginkan 8 lantai dalam satu gedung. Audit energi ini dilakukan untuk mengetahui apakah sistem tata udara pada gedung Bandung Electronic Center (BEC) masih memiliki standar dan kenyamanan yang layak berdasarkan kapasitas katalog mesin yang dirancang dan standar yang berlaku di Indonesia sesuai dengan SNI 03-6390-2011 tentang konservasi energi sistem tata udara pada bangunan dan gedung. Berdasarkan hasil perhitungan yang dibandingkan dengan katalog cooling tower memiliki 39% kapasitas energi terpakai dan 61% kapasitas energi tidak terpakai. Pada chiller memiliki nilai 68% kapasitas energi terpakai dan 32% kapasitas energi tidak terpakai. Heat Rejection berdasarkan hasil perhitungan sebesar 31% kapasitas energi terpakai dari kapasitas pendingingannya. COP sudah sesuai dengan standar SNI, begitu juga dengan KW/TR sudah sesuai dengan nilai pada katalog. Chiller masih dikatakan layak karena masih sesuai dengan standar. Pada AHU memiliki 97,1% kapasitas energi terpakai dan 2,9% kapasitas energi tidak terpakai. Dengan rata-rata ducting loss kurang dari 1%. Sehingga AHU sangat layak beroperasi karna sesuai dengan standar.Pada room cooling load memiliki nilai yang masih bisa di backup oleh AHU sehingga ruangan masih tetap dingin. Pada TDB dan RH pada room mall masih sesuai dengan SNI sehingga masih dikatakan layak operasi. Kata kunci: sistem tata udara, audit energi, kelayakan, kenyamanan.

Deskripsi Alternatif :

The air conditioning system is a technology for air conditioning in accordance with the temperature and humidity needed, has a very important role in increasing the comfort of residents in it. At the Bandung Electronic Center Mall (BEC) the audited air system is two units of water col- lied chillers, two cooling tower units, and 19 air handling units (AHU) to cool 8 floors in one building. This energy audit was conducted to find out whether the air conditioning system in the Bandung Electronic Center (BEC) building still has decent standards and comfort based on the capacity of the engine catalog designed and standards that apply in Indonesia in accordance with SNI 03-6390-2011 concerning energy conservation air in buildings and buildings. Based on the results of calculations compared to the cooling tower catalog, it has 39% of used capacity energy and 61% of unused capacity energy. The chiller has a value of 68% of used capacity energy and 32% of unused capacity energy. Heat Rejection based on the calculation results of 31% used capacity energy of the cooling capacity. The COP is in accordance with SNI standards, as well as KW / TR according to the values in the catalog. Chiller is still said to be feasible because it is still in accordance with the standard. AHU has 97.1% of used capacity energy and 2.9% of unused capacity energy. With an average ducting loss of less than 1%. So the AHU is very feasible to operate because it complies with the standard. In the room cooling load the value can still be backed up by AHU so the room is still cold. The TDB and RH in the mall room are still in accordance with SNI so it is still said to be feasible for operation. Keywords: air conditioning system, energy audit, feasibility, comfort.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ade Suryatman Margana, S.T., M.Eng.



    Pembimbing 2: Muhammad Nuriyadi, S.T., M.Eng., Editor: Erlin Arvelina

Download...