Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2018

Evaluasi Faktor Daya Listrik Pada Gedung P2T Politeknik Negeri Bandung

Evaluation of Electrical Power Factor at P2T Building Politeknik Negeri Bandung

Tugas Akhir, 053 / 2018 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2019-05-29 14:02:42
Oleh : Rizal Tiannov Mulyadi - 151321056 (rizaltiannov@gmail.com)
Dibuat : 2019-05-29, dengan 4 file

Keyword : Energi Listrik, Daya listrik, Faktor Daya, Evaluasi Faktor Daya Listrik
Subjek : Electrical Energy, Electrical Power, Power Factor, Evaluation of Electrical Power Factor

Energi listrik merupakan salah satu kebutuhan pokok manusia yang.harus terpenuhi untuk dapat menggerakan roda kehidupan. Energi listrik dibutuhkan hampir pada setiap bidang. Kebutuhan akan energi tersebut selalu mengalami kenaikan yang cukup signifikan di setiap tahunnya. Peningkatan terhadap kebutuhan energi listrik erat kaitannya dengan peningkatan penggunaan daya listrik. Gedung P2T yang merupakan pusat laboratorium komputer untuk setiap jurusan yang ada di Politeknik Negeri Bandung (Polban) ialah gedung dengan karakteristik pemakaian energi listrik yang cenderung dalam keadaan yang berfluktuasi pada setiap harinya. Dimana penggunaan daya listrik di gedung P2T pada hari Rabu atau ketika laboratorium komputer sedang beroperasi maka daya listriknya berada pada kondisi titik puncak, yang mana nilai faktor dayanya (cos Ҩ) dibawah standar beban yang diperbolehkan PLN, yaitu < 0,85 yang bernilai 0,841. Data tersebut didapat dari hasil pengukuran menggunakan alat ukur Power Quality Analyze yaitu "Metrel MI2792 Power Q4 Plus". Dengan menggunakan pendekatan kualitatif serta melalui metode observasi dan studi kepustakaan/literatur. Adapaun perbaikan faktor daya dilakukan dengan merubah faktor daya menjadi 0,98 yang didapat dengan cara melakukan penambahan kapasitor bank yang bermuatan 12,5 kVAR yang diperkirakan akan menghabiskan anggaran sebesar Rp1.367.300,-. Dengan nilai daya aktif, daya reaktif, daya semu dan arus baru yang dihasilkan sebesar 31,03 kW; 5,918 kVAR; 29,765 kVA dan 47,44 A dari yang awalnya bernilai 29,17 kW; 18,03 kVAR; 31,59 kVA dan 49,46 A. Sehingga dapat dilakukan penghematan daya semu sebesar 1,825 kVA dan penghematan arus sebesar 2,497 A. Selain itu, gedung P2T Polban akan memiliki penambahan beban sebesar 186 kWatt. Kata kunci: Energi Listrik, Daya listrik, Faktor Daya, Evaluasi Faktor Daya Listrik.

Deskripsi Alternatif :

Electrical energy is one of the basic human needs that must be fulfilled to be able to move the wheel of life. Electric energy is needed almost in every time field. The energy needs always increase significantly every year. The increasing of electrical energy needs is closely related to increased use of electricity. P2T building which is the center of the laboratory computer for each department in Politeknik Negeri Bandung (Polban) is a building with electrical energy usage with characteristics tend to be in a fluctuate every day. The use of electric power in the P2T building on Wednesday or when the computer lab is operating, then the electrical power is on peak point conditions, where the power factor value (cos Ҩ) is below the standard load PLN is allowed, which is < 0,85 having value amount 0,841. The data are obtained from the results measurement using a Power Quality Analyze measuring instrument, namely "Metrel MI2792 Power Q4 Plus". This study is used a qualitative method and by observating and doing library study/literature review. There are improvements in power factor done by changing the power factor to 0,98 which was obtained by adding a bank capacitor containing 12,5 kVAR, which is estimated to spend a budget of Rp1.367.300. With active power values, reactive power, apparent power and new currents generated by 31,03 kW; 5,918 kVAR; 29,765 kVA and 47,44 A from the beginning worth 29,17 kW; 18,03 kVAR; 31,59 kVA and 49,46 A. So that, it can be done apparent power savings of 1,825 kVA and current savings of 2,497 A. Besides that, P2T building will add load of 186 kWatt. Keywords: Electrical Energy, Electrical Power, Power Factor, Evaluation of Electrical Power Factor.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Sunarto, S.T., M.Eng.

    Pembimbing 2: Robert Adriaan Philippus, S.ST., M.Eng., Editor: Erlin Arvelina

Download...