Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2019

Studi Perbaikan Tegangan pada Penyulang Gunung Dukuh Di PT PLN Area Cimahi

Study of Voltage Drop Repair in Gunung Dukuh Feeders At PT PLN Cimahi Area

Tugas Akhir, 062 / 2019 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2020-03-23 10:15:46
Oleh : Robby Irmawan - 161321027 (probbyirmawan3@gmail.com )
Dibuat : 2020-03-23, dengan 4 file

Keyword : Distribution network, voltage drop, voltage increase, change of cable cross section area, capacitor installation, ETAP 12.6
Subjek : Jaringan distribusi, jatuh tegangan, perbaikkan tegangan, penggantian luas penampang kabel, pemasangan kapasitor, ETAP 12.6.

Dalam sistem jaringan distribusi tenaga listrik pasti memiliki jatuh tegangan dan rugi daya yang bisa disebabkan oleh jarak beban ke gardu terlalu jauh sehingga menurunnya tegangan sumber dan factor daya. Batas jatuh tegangan yang ditoleransi atau diizinkan oleh standar SPLN 72 : 1987 yang menyatakan bahwa jatuh tegangan pada jaringan tegangan menengah hanya diperbolehkan 5% bagi system jaringan radial dan 2 % bagi system jaringan spindle. Tugas akhir ini akan melakukan simulasi perbaikkan kualitas tegangan pada jaringan distribusi dengan penggantian luas penampang kabel penyulang dan pemasangan kapasitor. Proses perbaikkan ini akan disimulasikan menggunakan perangkat lunak ETAP 12.6. Hasil simulasi tegangan sebelum perbaikan pada ujung penyulang sebesar 16,3 kV kemudian dilakukan simulasi perbaikan dengan penggantian kabel dan pemasangan kapasitor. Hasil simulasi perbaikan tegangan dengan penggantian kabel sebesar 16,9 kV dan hasil simulasi perbaikan tegangan dengan pemasangan kapasitor sebesar 19,3 kV.

Deskripsi Alternatif :

In a power distribution network system must have a voltage drop and power loss that can be caused by the distance of the load to the substation too far so that the source voltage and power factor decreases. Voltage drop limits that are tolerated or permitted by the SPLN 72: 1987 standard which states that voltage drops on medium voltage networks are only allowed 5% for radial network systems and 2% for spindle network systems. This final project will conduct a simulation of improving the quality of the voltage on the distribution network by replacing the cross-sectional area of the cable feeder and the installation of capacitors. This improvement process will be simulated using ETAP 12.6 software. The voltage simulation results before repairing at the tip of feeder is 16.3 kV then the repair simulation is done by replacing the cables and installing capacitors. The results of simulation of voltage improvement with cable replacement of 16.9 kV and the results of simulation of voltage repair with capacitor installation of 19.3 kV.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Dedi Nono Suharno, M.T.


    Pembimbing 2: Ir. Heri Budi Utomo, Editor: Muhammad Abdillah Islamy, S.Pd

Download...