Path: Top > Tugas Akhir - D3 > Jurusan Teknik Sipil > Program Studi Teknik Sipil Umum (Kerja Sama Dinas Pekerjaan Umum) > 2013

PERANCANGAN PENINGKATAN JALAN RUAS TETEHOSI-HOLI (STA.0+000 s/d STA.3+100) DI KABUPATEN NIAS PROVINSI SUMATERA UTARA

THE DEVELOPMENT PLANNING OF THE ROAD BETWEEN TETEHOSI–HOLI (STA.0+000 s/d STA.3+100) IN NIAS RESIDENCE PROVINCE OF NORTH SUMATERA

Tugas Akhir, 003 / 2013 / T.SI UMUM
Undergraduate Theses from JBPTPPOLBAN / 2015-07-07 12:40:08
Oleh : Robert Restu Zebua - 101123008 (zrestu@yahoo.co.id)
Dibuat : 2015-07-07, dengan 4 file

Keyword : perancangan jalan, tetehosi, holi, nias
Subjek : road planning, tetehosi, holi, nias

Ruas jalan Tetehosi–Holi terletak di Kabupaten Nias Provinsi Sumatera Utara yang termasuk dalam jaringan jalan primer yang menghubungkan daerah Tetehosi sebagai Pusat Pengembangan Kawasan (PPK) dengan daerah Holi sebagai Pusat Pengembangan lingkungan (PPL). Berdasarkan Rencana Tata Ruang Wilayah (RTRW) Kabupaten Nias Tahun 2013 ruas jalan ini mengalami peningkatan fungsi jalan sebagai jalan Kolektor Primer dan kelas jalan sebagai jalan Kelas III. Seiring dengan pertumbuhan kendaraan di Kepulauan Nias sebesar 5,2 % pertahun maka perlu dilakukan peningkatan kinerja perkerasan jalan pada jalan ruas Tetehosi–Holi sehingga dapat berfungsi secara optimal sesuai Standar Pelayanan Minimum Jalan Kabupaten. Penanganan jalan ruas Tetehosi–Holi adalah melakukan pelebaran badan jalan (widening) sehingga lebar jalan keseluruhan menjadi 8 meter (perkerasan 5 meter dan bahu jalan masing- masing 1,5 meter pada sisi kiri dan kanan jalan) serta pekerjaan pelapisan tambah (overlay) pada lapisan permukaan jalan eksisting. Berdasarkan perhitungan tebal perkerasan menggunakan metode Analisa Komponen SKBI-2.3.26.1987 didapatkan tebal perkerasan overlay tebal 10 cm menggunakan AC-BC tebal 6 cm dan AC-WC tebal 4 cm. Untuk daerah pelebaran (widening) tebal perkerasan yang didapatkan adalah lapis pondasi tebal 20 cm menggunakan Sirtu kelas B CBR 50 %, lapis pondasi atas tebal 15 cm menggunakan batu pecah kelas A dan lapis permukaan tebal 10 cm menggunakan AC-BC tebal 6 cm dan AC-WC tebal 4 cm. Biaya konstruksi keseluruhan untuk pekerjaan peningkatan jalan ruas Tetehosi–Holi (STA.0+000 s/d STA.3+100) setelah ditambahkan Pajak Pertambahan Nilai (PPN) 10 % adalah Rp. 6.322.396.000,- (enam milyar tiga ratus dua puluh dua juta tiga ratus sembilan puluh enam ribu rupiah). Kata kunci: perancangan jalan, tetehosi, holi, nias.

Deskripsi Alternatif :

The road between Tetehosi–Holi lies in Nias Residence Province of North Sumatera which is included in the primary road network that connects Tetehosi area as the centre of area development to the area of Holi as the centre of environmental development. Based on the area design master plan of Nias Residence year 2013, the road will be having the upgraded function as the primary collector road and the road class will be classified as class III. As the growing of vehicle volume on Nias Islands which reaches 5,2 percent per year, it needs increasing of solidness qualifications of the road in order can be fully functioned according to the Road Minimum Standard of Service as residence road level. The work of the road between Tetehosi–Holi is road widening so the total width becomes 8,0 metre (hardening 5,0 metre and shoulder 1,5 metre each right and left side) and also overlay work for exsiting surface. Based on the calculation of hardening thickness which uses Component Analysis Method SKBI -2.3.26.1987 it shows that the thickness of hardening overlay of 10 cms uses AC-BC thickness 6 cms meanwhile AC-WC thickness is 4 cms. For widening area the hardening thickness is foundation layer 20 cms that is used gravel class B CBR 50 percent, the upper foundation layer is 15 cms which uses granular materials class A and the surface layer is 10 cms that uses AC-BC 6,0 cms and AC-WC 4 cms. The total construction cost for the work of upgrading road between Tetehosi – Holi (STA. 0+000 s/d STA. 3+100) after summed with tax (PPN) 10 percent is IDR.6.322.396.000.- (six billions three hundred and twenty two millions three hundred and ninety six thousands rupiah). Keywords: road planning, tetehosi, holi, nias

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing POLBAN: Lilian Diasti Dessi Widuri, SST., MT.

    Pembimbing PU : Ir. Edie Djunaedie
    , Editor: Erlin Arvelina

Download...