Perubahan Tata Letak Peralatan Sistem Perakitan di Lintasan Kerja Pembuatan Produk All Terrain Vehicle di PT Showa Indonesia manufacturing

Re-layout of Assembly System Equipment in Working Line to Manufacturing of All Terrain Vehicle Product at PT Showa Indonesia Manufacturing

Skripsi, 022 / 2018 / PMA
Undergraduate Theses from JBPTPPOLBAN / 2019-01-15 12:34:26
Oleh : Tri Eka Dhana - 141244027 (triekadhana640@gmail.com)
Dibuat : 2019-01-15, dengan 4 file

Keyword : Tata Letak, Material Handling, Efisiensi, Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart (FTC)
Subjek : Layout, Material Handling, efficiency, Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart (FTC)

Tata letak fasilitas produksi sangat mempengaruhi proses produksi yang terjadi dalam sebuah pabrik. Perancangan tata letak haruslah direncanakan dengan sebaik mungkin agar terciptanya tata letak yang efisien dan optimal dengan panjang lintasan material handling yang pendek. PT Showa Indonesia Manufacturing adalah perusahan yang bergerak di bidang otomotif, khususnya untuk pembuatan shock absorber untuk kendaran bermotor. Penelitian ini bertujuan untuk merancang tata letak serta ukuran luas lantai pada lintasan produksi pembuatan all terrain vehicle dengan kondisi optimal dan panjang lintasan yang pendek menggunakan metode From To Chart (FTC), Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD). Dari hasil penelitian dapat disimpulkan bahwa tata letak letak usulan yang terpilih dalam penelitian ini menunjukan penurunan panjang lintasan material handling yang cukup signifikan yaitu untuk RC 1 2.264 m atau sekitar 13% , RC 2 6.366 m atau sekitar 23%, ATV tipe A 0.829 m atau sekitar 4% , dan ATV tipe B 5.264 m atau sekitar 17% lebih pendek dari layout awal. Selain itu berdasarkan pengolahan data layout usulan yang terpilih juga lebih pendek dari layout alternatif 1 dengan selisih panjang lintasan material handling sepanjang ATV tipe A 0.163 m atau sekitar 1% , dan ATV tipe B 1.789 m atau sekitar 6%. Secara tidak langsung penurunan panjang lintasan material handling ini akan berdampak terhadap penurunan biaya material handling yang selama ini keluarkan. Kata kunci: Tata Letak, Material Handling, Efisiensi, Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart (FTC).

Deskripsi Alternatif :

Layout of production facilities greatly affects the production process that occurs in a factory. The design of the layout should be planned as well as possible in order to create an efficient and optimal layout with a short material handling path. PT Showa Indonesia Manufacturing is an automotive company, specifically shock absorber for motor vehicles. This study aims to design the layout and size of the floor on the production trajectory of all terrain vehicles with optimal conditions and short path using the method of From To Chart (FTC), Activity Relationship Chart (ARC) and Activity Relationship Diagram (ARD). From the result of the research, it can be concluded that the layout of the proposed location chosen in this study shows the decrease of material handling path length significantly for RC 1 2,264 m or about 13%, RC 2 6,366 m or about 23%, ATV type A 0.829 m or about 4%, and ATV type B 5.264 m or about 17% shorter than the initial layout. In addition, based on the data processing layout of the proposed proposal is also shorter than alternative layout 1 with the length difference of material handling path along ATV type A 0.163 m or about 1% , and ATV type B 1.789 m or about 6%. Indirectly, the decrease of this material handling path will have an impact toward the decrease of material handling cost that has been spent. Keywords: Layout, Material Handling, efficiency, Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart (FTC).

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Ating Sudradjat, M.Sc.

    Pembimbing 2: Sigit Kurnia Muliawan, Editor: Erlin Arvelina

Download...