Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Perancangan Jalan & Jembatan > 2017

Perancangan Struktur Perkuatan Tanah pada Timbunan Jalan Pendekat (Oprit) Overpass 4 Pangkalan

Design of The Soil Reinforcement Structure on The Embankment Approach of Road (Oprit) Overpass 4 Pangkalan

Tugas Akhir, 028 / 2017 / TPJJ
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:26
Oleh : Vivi Adinda Laksono - 131134028 (viviadindal@gmail.com)
Dibuat : 2018-02-21, dengan 4 file

Keyword : blok modular, geogrid, geosintetik, oprit, overpass
Subjek : modular block, geogrid, geosynthetic, oprit, overpass

Overpass 4 Pangkalan merupakan pengganti Jalan Pangkalan eksisting yang digunakan untuk melewati Jalan Tol Soreang-Pasir Koja di bagian bawahnya. Kondisi lokasi pembangunan Overpass 4 Pangkalan ini berupa pemukiman warga dengan jarak antara rumah warga dan rencana jalan pendekat (oprit) sebesar 5 meter, serta dimensi timbunan tertinggi sebesar 10 meter. Berdasarkan kondisi tersebut, lahan yang dapat digunakan untuk pembuatan kaki timbunan sangat terbatas dan beresiko terhadap longsor. Faktor keamanan kaki timbunan tanpa perkuatan yang didapatkan yaitu sebesar 0,994 dan tidak memenuhi syarat minimum 1,5. Sehingga diperlukan perkuatan timbunan dengan mempertimbangkan kondisi tanah dan lahan yang ada. Struktur perkuatan tanah yang digunakan yaitu dinding penahan tanah dengan perkuatan geosintetik berupa geogrid. Analisis dilakukan pada oprit dengan panjang 236 meter dan lebar 9 meter. Analisis terdiri dari 2 tahapan, yaitu analisis stabilitas eksternal dan internal. Stabilitas eksternal yang diperhitungkan yaitu gelincir, guling, dan daya dukung. Sementara pada stabilitas internal diperhitungkan bidang gelincir kritis, keruntuhan akibat putus dan cabut, gaya tarik maksimum, serta sambungan. Berdasarkan hasil analisis, tipe geogrid yang digunakan yaitu RE 560 dengan bahan polimer berjenis polietilena, jumlah lapisan yang digunakan sebanyak 30 lapisan, sambungan dibantu dengan polymeric connector, penutup muka berupa dinding blok modular dengan panjang 0,4 meter, lebar 0,2 meter, dan tinggi 0,2 meter. Metode pelaksanaan pekerjaan terdiri dari persiapan pekerjaan, galian, timbunan, dinding penahan tanah dengan perkuatan geogrid, dan pembersihan. Rencana anggaran biaya yang diperlukan sebesar Rp.24.552.499.273,00 (dua puluh empat milyar lima ratus lima puluh dua juta empat ratus sembilan puluh sembilan ribu dua ratus tujuh puluh tiga rupiah). Kata kunci: blok modular, geogrid, geosintetik, oprit, overpass.

Deskripsi Alternatif :

Overpass 4 Pangkalan is substitute of the existing Pangkalan Road, that used for pass the Soreang-Pasir Koja Toll Road which built under it. Near the location of Overpass 4 Pangkalan, there are some residential area. The distance between houses and the embankment approach of road is 5 meters, and the highest dimension of embankment approach of road is 10 meters. Based on these conditions, the area that can be used to construct the foot part of embankment only has very limited and has some risk of landslides. The safety factor of the foot part of embankment is 0.994 and does not fulfill the requirement of 1.5. So, the foot part of embankments needs reinforcement by considering the existing condition of soil and area. The soil reinforcement structure used is retaining wall with geosynthetic in the form of geogrid. The analysis was performed on an oprit with length of 236 meters and width of 9 meters. The analysis consists of 2 stages, are external and internal stability. The calculated of external stability consists of slip, bolster, and carrying capacity. While on the calculated of internal stability consists of critical slip fields, collapse due to break and pull, maximum tensile, and the connection. Based on the analysis, used the geogrid type is RE 560 with polyethylene type polymer, the number of layers used are 30 layers, the connection is assisted by polymeric connector, the facing unit is modular block wall with length 0.4 meters, width 0.2 meters, and height 0.2 meters. Work methods consists of job preparation, excavation, embankment, retaining wall with geogrid reinforcement, and cleaning area. The required budget plan is Rp.24,552,499,273.00 (twenty four billion five hundred fifty two million four hundred ninety nine thousand two hundred seventy three rupiahs). Keywords: modular block, geogrid, geosynthetic, oprit, overpass.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Syahril, B.S.C.E., M.T., Editor: Erlin Arvelina

Download...