Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2018

Rancang Bangun Pembangkit Sel Surya Substitusi Catu Daya PLN 300 WH

Build And Design Of Solar Cell Power Plants Substitution PLN 300 WH

Tugas Akhir, 059 / 2018 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2019-05-29 14:21:45
Oleh : Wanda Candra Nugraha - 151321062 (wandacandra666@gmail.com)
Dibuat : 2019-05-29, dengan 4 file

Keyword : Sel Surya, Pembangkit listrik, Substitusi PLN
Subjek : Solar Cell, Power Plant, Substitution of PLN

Kebutuhan energi listrik semakin tinggi karena peningkatan kebutuhan suplai listrik disetiap rumah tinggal yang meningkat akibat banyaknya peralatan yang harus menggunakan sumber listrik seiring dengan perkembangan zaman. Peningkatan kebutuhan ini tidak sebanding dengan ketersediaan sumber daya energi, sehingga perlu dicari alternatif yang dapat dilakukan. Salah satu sumber energi natural yang belum digunakan secara maksimal adalah energi surya atau sinar matahari. Energi surya merupakan sumber energi terbarukan yang ketersediaanya tidak terbatas. Untuk mendapatkan energi listrik yang berasal dari matahari digunakan pembangkit sel surya sehingga energi cahaya dari matahari dapat berubah menjadi energi listrik. Namun kebanyakan dari sel surya hanya dipasang dirumah yang memang belum terjangkau aliran listrik PLN (Perusahaan Listrik Negara). Oleh sebab itu rumah yang sudah terhubung kejaringan listrik PLN perlu juga memasang sel surya sebagai energi alternatif guna menghemat biaya yang harus dikeluarkan setiap bulannya kepada PLN. Dari hal tersebut penulis mencoba membuat sebuah PLTS (Pembangkit Listrik Tenaga Surya) dengan sistem pensaklaran otomatis ataupun manual yang terhubung juga dengan jaringan listrik PLN. Dengan prinsip kerja inter lock antara dua buah sumber catu daya yang bekerja secara bergantian sesuai kebutuhan. Daya yang dapat disuplai oleh PLTS ini yaitu sebesar 300 WH untuk kebutuhan hanya pada saat malam hari karena ketika siang hari suplai listriknya berasal dari PLN dan juga pada siang hari sekitar 4 jam waktu efektif antara jam 10.00-14.00 digunakan sebagai waktu untuk pengisian baterai sebesar 50Ah yang disuplai oleh sel surya sebesar 100 WP. Kata kunci: Sel Surya, Pembangkit listrik, Substitusi PLN.

Deskripsi Alternatif :

The need for electrical energy is higher due to the increasing demand of electricity supply in every building which is increasing due to the many equipments that have to use the power source along with the development of the era. This increase in demand is not proportional to the availability of energy resources, so it is necessary to find an alternative that can be done. One source of natural energy that has not been used optimally is solar energy or sunlight. Solar energy is a renewable energy source that is unlimited. To get electrical energy coming from the sun is used solar cell generator so that light energy from the sun can be transformed into electrical energy. But most of the solar cells are only installed at home which is not yet affordable PLN electricity (Satate Electricity Company). Therefore, the house that is connected to PLN's electricity network needs to install solar cells as an alternative energy in order to save the cost that must be paid every month to PLN. From this the authors try to make a PLTS (Solar Power Plant) with automatic or manual switching system that is also connected to the PLN power grid. With the principle of inter lock work between two power supply sources that work interchangeably as needed. Power that can be supplied by this PLTS is 300 WH for the needs only at night because when the daytime electricity supply comes from PLN and also at noon about 4 hours effective time between the hours of 10:00 to 14:00 is used as a time for charging the battery of 50Ah supplied by a solar cell of 100 WP. Keywords: Solar Cell, Power Plant, Substitution of PLN.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Abdullah Asegaf, M.T.


    Pembimbing 2: Yoseph Santosa, S.T., M.Eng., Editor: Erlin Arvelina

Download...