Perencanaan Konstruksi Lift Barang dengan Kapasitas 350 Kg di PT. Medion Farma Jaya

Construction Planning of Freight Elevator with 350 Kg Capacity at PT. Medion Farma Jaya

Skripsi, 026 / 2018 / PMA
Undergraduate Theses from JBPTPPOLBAN / 2019-01-15 12:47:33
Oleh : Zam Zam Firdaus - 141244032 (zamzam.engineer@gmail.com)
Dibuat : 2019-01-15, dengan 4 file

Keyword : Perencanaan lift barang, Perhitungan, Pemilihan bahan dan Operation process chart, Rancangan konstruksi yang kuat dengan estimasi waktu pembuatan lift
Subjek : Freight elevator planning, Calculation, Material selection and Operation process chart, Strong construction design with estimated time for lift-making

PT. Medion Farma Jaya adalah perusahaan yang berkecimpung dalam bisnis produksi dan pemasaran produk farmasi, vitamin, vaksin, dan peralatan unggas Selama 40 tahun. Perusahaan ini telah dikenal sebagai perusahaan terkemuka di pasar lokal dan telah berkembang di seluruh Asia dan Afrika. PT. Medion Farma Jaya telah menerapkan GMP ( good manufacturing practice ) dalam proses manufakturnya guna memastikan kualitas dan keamanan produknya. Dengan komitmennya dalam menghadirkan produk berkulitas tinggi dan memenuhi kepuasaan pelanggan PT. Medion Farma Jaya memiliki keinginan untuk membuat lift barang baru guna memperlancar jalannya produksi dan meningkatkan produktivitas pada gedung baru yang rencananya akan dibuat. Permasalahan yang terjadi pada pembuatan lift barang tersebut dikarenakan ukuran dan kapasitas yang ada di pasaran tidak sesuai dengan daftar tututan perusahaan sehingga setiap kali perusahaan ingin membuat lift barang hal tersebut selalu dikerjakan oleh perusahaan sendiri, namun perencanaan lift barang yang dilakukannya tersebut belum mempertimbangkan perhitungan secara teoritis khususnya dalam kekuatan material pada konstruksi lift nya. Sehingga untuk menyelesaikan permasalahan yang terjadi pada PT. Medion Farma Jaya tersebut dilakukan perencanaan lift barang dengan menitik beratkan pada perhitungan kekuatan material konstruksi lift , pemilihan bahan untuk konstruksi lift , dan pembuatan peta proses kerja atau operation process chart. Perencanaan lift barang yang dilakukan menghasilkan kesimpulan bahwa kontruksi lift barang yang ada di PT. Medion Farma Jaya mampu menahan beban muatan sebesar 350 Kg dengan waktu pembuatan konstruksi lift barang selama 7 hari dengan kententuan 8 jam kerja per hari. Kata kunci: Perencanaan lift barang, Perhitungan, Pemilihan bahan dan Operation process chart, Rancangan konstruksi yang kuat dengan estimasi waktu pembuatan lift.

Deskripsi Alternatif :

PT. Medion Farma Jaya is a company focused on the production and marketing sector of pharmaceutical, vitamin, vaccine and poultry equipment products for 40 years. This company has been known as a leading company in the local market and has grown all over Asia and Africa. PT. Medion Farma Jaya has implemented GMP (Good Manufacturing Practice) in its manufacturing process to ensure the quality and the safety of its products. With its commitment in presenting high quality products and meeting customer satisfaction PT. Medion Farma Jaya has a desire to make new freight elevators in order to facilitate production process and increase productivity in the new building planned. The occurring problems in the construction of freight elevators is the size and capacity on the market do not match the company's demand list so that whenever the company wants to make an elevator, the construction has to be done by the company itself, but the planning of the freight elevator does not consider theoretical calculations especially in the material strength of the elevator construction. So, as to solve the problems that occur at PT. Medion Farma Jaya the plan to carry out freight lifts by focusing on calculating the strength of the elevator construction material is made, selecting materials for elevator construction, and making work process maps or operation process charts. The goods elevator construction plan that was carried out resulted in the conclusion that the construction of the freight elevator at PT. Medion Farma Jaya is able to withstand a load of 350 Kg with the construction time of the freight elevator for 7 days with the provision of 8 working hours per day. Keywords: Freight elevator planning, Calculation, Material selection and Operation process chart, Strong construction design with estimated time for lift-making.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Suyitno, M.Eng.

    Pembimbing 2: Dodi Rukmana, A.Md., Editor: Erlin Arvelina

Download...