Dampak Keterlambatan Terhadap Peningkatan Biaya Pelaksanaan Dengan Metode Earned Value Pada Proyek Condotel Kyriad Boutique Village Bandung

The Impact of Delays to The Increase of Construction Cost Based on Earned Value Method at Condotel Kyriad Boutique Village Project Bandung

Tugas Akhir, 027 / 2017 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:26
Oleh : Zulva Haekal Natsir - 131144031 (zulvahaekaln@gmail.com)
Dibuat : 2018-02-19, dengan 4 file

Keyword : Biaya, Keterlambatan, Sumber Daya Pekerja, Waktu
Subjek : Cost, Delays, Worker Resources, Time

Berjalannnya waktu pelaksanaan proyek Condotel Kyriad Boutique Village ini memiliki beberapa faktor salah satunya jumlah sumber daya pekerja di lapangan yang tidak sesuai dengan sumber daya pekerja yang telah direncanakan dan produktivitas pekerja di lapangan yang rendah. Hal ini menyebabkan terjadinya keterlambatan, oleh karena itu proyek ini mengalami keterlambatan yang berdampak terhadap biaya pelaksanaan. Metode kontrol pada saat pelaksanaan konstruksi dengan menggunakan metode earned value meliputi waktu dan biaya. Dari segi waktu untuk menghitung schedule variance yaitu perbedaan antara waktu pelaksanaan dengan waktu yang telah direncanakan dan schedule performance indeks yaitu prestasi kerja di lapangan dari segi waktu. Untuk segi biaya untuk menghitung cost variance yaitu perbedaan antara biaya yang telah direncanakan pada pekerjaan tersebut dengan biaya yang dikeluarkan untuk mengerjakan pekerjaan tersebut dan cost performance indeks yaitu prestasi kerja di lapangan yang dihitung dari segi biaya. Pengurangan keuntungan yang dialami oleh pihak kontraktor akibat sumber daya pekerja di lapangan tidak sesuai dengan sumber daya pekerja yang telah direncanakan dan produktivitas pekerja yang rendah yaitu sebesar Rp. 314.167.648. Seharusnya pihak kontraktor mendapat keuntungan sebesar Rp. 950.000.000. Sehingga diberikan saran agar pada saat pelaksanaan pekerjaan proyek ini pihak kontraktor harus lebih memperhatikan control dan aktuating pada setiap minggunya saat pelaksanaan pekerjaan di lapangan agar pekerjaan dapat berjalan sesuai dengan waktu dan anggaran yang telah direncanakan Kata Kunci: Biaya, Keterlambatan, Sumber Daya Pekerja, Waktu.

Deskripsi Alternatif :

The running time of the Condotel Kyriad Boutique Village project has several factors, one of which is the number of worker resources in the field that do not match the planned workforce resources and the low worker productivity. therefore the project is experiencing delays that impact on the cost of implementation. Control methods during construction implementation is using the earned value method include time and cost. From terms of time to calculating the variance schedule is the differenct between the time of implementation with the planned time and schedule performance index is the performance of working in terms of time. In terms of cost to calculate the cost variance is differenct between the cost that has been planned at the job with the cost incurred to do the work and cost performance index is the performance of work in the field which is calculated in terms of cost. The reduction of profits experienced by the contractor due to worker resources in the field is not in accordance with the planned worker resources and low labor productivity of Rp. 314.167.648. The contractor should have a profit of Rp. 950.000.000. So given the suggestion that during the execution of this project work the contractor must pay more attention control and actuing every week when the implementation of work in the field so that work can run in accordance with the time and budget that have been planned. Keywords: Cost, Delays, Worker Resources, Time.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakHelmi Purwanti
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorhelmi.purwanti@polban.ac.id
E-mail CKOhelmi.purwanti@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. Mei Sutrisno, M.Sc., Ph.D., Editor: Erlin Arvelina

Download...