Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018
Metode Pelaksanaan, Perhitungan Rencana Anggaran Pelaksanaan, dan Penjadwalan Pekerjaan Struktur Bawah pada Proyek Apartemen Swarnabumi Residence Bandung
Work Methods, Calculation of Implementation Budget Plan, and Scheduling Sub- Structure works in Apartement Swarnabumi Residence Bandung Project
Tugas Akhir, 008 / 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2019-07-02 10:56:55
Oleh : 151111004 - Arcy Pramadhany Gunawan - 151111056 - Rivan Dwicahyo Saputro (rivan.dwi94@gmail.com)
Dibuat : 2019-07-02, dengan 4 file
Keyword : method of implementation, WBS, the implementation of the budget plan, scheduling, network planning.
Subjek : metode pelaksanaan, WBS, rencana anggaran pelaksanaan, penjadwalan, network planning.
Proyek pembangunan apartemen Swarnabumi Residence memiliki dua tower utama, yaitu tower 1 dan tower 2. Keduanya memiliki jumlah lantai sebanyak 24 lantai utama dan 3 lantai basement dengan total luas bangunannya 56.722,76 m2. Pembangunan proyek ini termasuk proyek yang besar dengan waktu penyelesaian yang cukup lama, yaitu 30 bulan berdasarkan dokumen kontrak. Untuk mengefektifkan dari segi mutu, biaya, dan waktu, diperlukan penyusunan metode pelaksanaan yang tepat agar menghasilkan hasil yang optimal yang kemudian dibuat dalam Work Breakdown Structure (WBS), selanjutnya dilakukan perhitungan rencana anggaran pelaksanaan. Untuk mengetahui berapa biaya dan waktu pelaksanaan proyek maka perlu dilakukan analisis volume dari masing-masing pekerjaan, analisa koefisien produktivitas dari sumber daya proyek dan harga dari setiap item pekerjaan. Untuk penjadwalan dibutuhkan data laporan harian dan work breakdown structure yang kemudian dibuat durasi penjadwalan menggunakan software Microsoft Project. Penentuan hubungan ketergantungan merupakan dasar pembuatan jaringan kerja setelah penentuan durasi, sehingga dapat diketahui urutan kegiatan dari awal mulainya suatu proyek sampai dengan selesainya proyek secara keseluruhan. Pembuatan network planning digunakan untuk menganalisa jalur kritis dan float (toleransi keterlambatan waktu suatu pekerjaan). Dalam tugas akhir ini, perhitungan rencana anggaran pelaksanaan struktur bawah meliputi pekerjaan galian, capping beam, dewatering, ground anchor, dan waller beam diperoleh biaya total Rp 3.901.889.136,83 (Include PPN 10%, profit, dan overhead) dan durasi proyek 223 hari serta terdapat 3 daftar pekerjaan kritis.
Deskripsi Alternatif :The apartment development project of Swarnabumi Residence has two main towers, namely tower 1 and tower 2. Both have 24 floors and 3 basement floors with total building area of 56,722.76 m2. The construction of this project includes a large project with a fairly long completion time, which is 30 months based on contract documents. To make effective in terms of quality, cost, and time, it is necessary to prepare the right method of implementation in order to produce optimal results which are then made in Work Breakdown Structure (WBS), then calculate the implementation budget plan. To find out how much cost and time of project execution it is necessary to analyze the volume of each work, analysis of the productivity coefficient of the project resources and the price of each work item. For scheduling required daily report data and work breakdown structure which then made the duration of scheduling using Microsoft Project software. Determination of dependency relationship is the basis of networking after the determination of duration, so it can know the sequence of activities from the beginning of a project until the completion of the project as a whole. Making network planning is used to analyze critical path and float (tolerance of delay time of a job). In this final project, the calculation of budget plan for the implementation of the lower structure includes excavation work, capping beam, dewatering, ground anchor, and waller beam. The total cost is Rp 3.901.889.136,83 (Include PPN 10%, profit, and overhead) and the duration of the project is 227 days and there are 9 critical jobs list.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Yullianty Noorlaelasari, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 151111004 - 151111056.pdf
(1128223 bytes)
File : BAB 1 - 151111004 - 151111056.pdf
(258108 bytes)
File : BAB 2 - 151111004 - 151111056.pdf
(356936 bytes)
File : BAB 5 - 151111004 - 151111056.pdf
(153780 bytes)