Perhitungan Ulang Pile-Raft Foundation Tower C pada Proyek Trans Park Cibubur
Recalculation of Tower CS Pile-Raft Foundation on Trans Park Cibubur Project
Tugas Akhir, 011 / 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2019-07-22 14:15:30
Oleh : 151111009 - Denissa Ayunda Putri - 151111029 - Sarah Shintia Dewi (denissaayunda@gmail.com)
Dibuat : 2019-07-22, dengan 4 file
Keyword : Recalculation of Tower , CS Pile-Raft Foundation, Trans Park Cibubur
Subjek : Perhitungan Ulang, Pile-Raft Foundation, Tower C, Trans Park Cibubur
Proyek Trans Park Cibubur menggunakan pile-raft foundation dengan jumlah pondasi bored pile rencana sebanyak 259 buah sedangkan pada pelaksanaannya berubah menjadi 199 buah. Tujuan dari penulisan laporan Tugas Akhir ini adalah untuk menghitung ulang perencanaan pondasi bored pile agar pondasi dapat memikul beban struktur atas yang terjadi. Berdasarkan perhitungan daya dukung untuk raft foundation menggunakan metode Terzaghi adalah 330 kN/m^2 sedangkan total beban struktur atas sebanyak 32 lantai dan 4 lantai basemen yang sebesar 371,172 kN/m^2, oleh karena itu dibutuhkan perkuatan menggunakan pondasi bored pile. Kapasitas daya dukung ijin bored pile dihitung berdasarkan data SPT (standard penetration test), didapat nilai daya dukung ijin sebesar 492,980 kN sehingga dibutuhkan 258 buah tiang bored pile. Kapasitas daya dukung pondasi bored pile dikontrol menggunakan data loading test dengan Metode Chin F. K dan Metode Mazurkiewicz yang menghasilkan nilai kapasitas daya dukung kritis dimana nilai tersebut lebih besar dari nilai kapasitas daya dukung pondasi bored pile, maka pondasi bored pile tidak dapat menahan beban struktur atas yang terjadi. Besarnya penurunan elastik pada kelompok tiang sebesar 91,79 mm. Berdasarkan hasil perancangan untuk raft foundation dengan tebal 1,5 m menggunakan tulangan D25-100 sedangkan untuk pondasi bored pile dengan diameter 1 m dan panjang 22 m menggunakan tulangan longitudinal 17D22 dan tulangan transversal D13-75
Deskripsi Alternatif :The Trans Park Cibubur Project uses a pile-raft foundation with a total of 259 bored pile foundation plans, while the implementation has changed to 199 pieces. The purpose of writing this final report is to recalculate the pile-raft foundation design so that the foundation can bear the upper structural load that occurs. Based on the calculation of the bearing capacity for raft foundation using the Terzaghi method is 330 kN/m^2 while the total load of the 32 stories and 4 basement of upper structure that occur are 371,172 kN/m^2, therefor it is necessary to have foundation strengthening using the bored pile foundation. The allowable bearing capacity of the bored pile foundation is calculated based on the Standard penetration test, obtained the allowable bearing capacity of 492,980 kN so that it takes 258 bored pile poles. Bearing capacity of bored pile foundation is controlled using loading test data with Chin F. K Method and Mazurkiewicz Method which obtained critical bearing capacity where the value is less than the value of bored pile bearing capacity, then the bored pile foundation can't withstand the upper structural load that occurs. The magnitude of the elastic settlements in the group pile are 91,79 mm. Based on the result of the design for raft foundation with a thickness of 1,5 m using reinforcement D25-100 while for bored pile foundation with a diameter of 1 m and a length of 22 m using 17D22 longitudinal reinforcement and transversal reinforcement D13-75.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Drs. Mulyadi Y., S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 151111009 - 151111029.pdf
(1091954 bytes)
File : BAB 1 - 151111009 - 151111029.pdf
(695281 bytes)
File : BAB 2 - 151111009 - 151111029.pdf
(1132477 bytes)
File : BAB 5 - 151111009 - 151111029.pdf
(723046 bytes)