Kajian Metode Pelaksanaan, Rencana Anggaran Pelaksanaan dan Penjadwalan Konstruksi Struktur Atas Proyek Toserba
Study Of Implementation Method, Budget Plan Execution And Schedulling Upper Structure For Department Store Construction Project
Tugas Akhir, 013 / 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2019-07-22 14:19:50
Oleh : 151111011 - Eka Satria Budiawan - 151111045 - Mega Lestari (megalestari150597@gmail.com)
Dibuat : 2019-07-22, dengan 4 file
Keyword : Steel Column, Steel Beam, composite Slab, Metal Deck, Wiremesh, Shear Conector, Bolt, RAP, Scheduling.
Subjek : Kolom Baja, Balok Baja, Pelat Komposit, Metal Deck, Wiremesh, Shear Conector, Baut, RAP, Penjadwalan.
Laporan tugas akhir ini berjudul Kajian Metode Pelaksanaan, Rencana Anggaran Pelaksanaan dan Penjadwalan Konstruksi Struktur Atas Proyek Toserba. Proyek ini memiliki nama Proyek Toserba Sumber Sari Junction dengan material baja komposit. Struktur baja komposit pada pelaksanaannya harus dilakukan dengan baik sehingga tujuan dari tugas akhir ini adalah menyusun metode pelaksanaan, rencana anggaran pelaksaan dan penjadwalan. Dalam mengerjakan laporan tugas akhir ini dilakukan metode observasi di lapangan untuk mendapatkan data gambar kerja, RKS, laporan harian, harga satuan dasar dan total biaya proyek. Sistem struktur yang digunakan pada proyek ini adalah sistem rangka pemikul momen. Pekerjaan struktur atas terdapat beberapa elemen struktur yaitu kolom baja, balok baja dan pelat lantai komposit. Metode pelaksanaan konstruksi struktur atas dilakukan fabrikasi elemen struktur baja profil terlebih dahulu di workshop. Selain itu pada pekerjaan pelat lantai komposit digunakan material Metal deck, wiremesh, shear conector dan beton readymix sehingga dalam melaksanaan pekerjaan struktur atas dilapangan dilakukan instalasi dengan menggunakan alat berat yaitu satu unit tower crane dan truck mixer. Sambungan yang digunakan yaitu baut dan las. Dalam melaksanakan pekerjaan struktur atas juga digunakan sistem zoning sehingga pekerjaan tersebut dapat efisien. Perhitungan rencana anggaran pelaksanaan dihasilkan Rp. 24.722.005.692,93,-. Sedangkan proyek konstruksi toserba ini memiliki jumlah biaya direct cost untuk RAB yaitu sebesar Rp. Rp.68.954.545.460,- dikali persentase struktur atas yaitu 29,918% maka dihasilkan biaya RAB untuk pekerjaan struktur atas adalah Rp.20.629.820.910,-. Kajian penjadwalan dibuat dengan menggunakan metode bar charts dan kurva S serta berdasarkan pembagian zona yang menggunakan metode finish to start agar tidak ada pekerja yang saling menunggu sehingga waktu pelaksanaan dapat efisien didapatkan durasi total yaitu selama 90 hari.
Deskripsi Alternatif :This final project titled is âStudy Of Implementation Method, Budget Plan Execution And Schedulling Upper Structure For Department Store Construction Projectâ This project named Toserba Sumber Sari Junction and use composite steel material. The composite steel structure in its implementation must be done well so the purpose of this final project is to prepare implementation methods, prepare an implementation budget plan and and prepare scheduling. In conducting this project, the data was collected by doing observation in Toserba Sumber Sari Junction. Moreover, this observation was done to get the shop drawing, the specification of technical structure, the daily report, unit cost and the total of the project cost. The structure system used in this project is Open Frame. Upper structure job has several structural elements such as steel column, steel beam and composite slab. In addition, the methods of this project was done pre-fabrication of steel structural elements in the workshop. Other than that on the composit slab work the material are used metal deck, wiremesh, shear conector and readymix concrete, so in the implementation in the project was done installation using heavy equipment (tower crane and truck mixer). The joints for the upper structure used are bolts and welds. Furthermore, upper structure is used zoning system so the project of efficients. The calculation of the implementation bugdet plan produced Rp. 24.722.005.692,93,-. While This project has a direct cost amount of Rp.68.954.545.460, multiple by precentage of the upper structure is 29,918% so this project has a contract cost amount of Rp.20.629.820.910. The scheduling was made by using bar charts and curves S methods as well as is based on the daily reports, observation results, zoning system which uses the finish to start method so that no workeeeer waits for each other so the scheduling can be efficient. The total duration of the upper strucutre work is 90 days.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Antonius Siswanto, S.ST., M.T.
Pembimbing 2: Yullianty Noorlaelasari, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 151111011 - 151111045.pdf
(692713 bytes)
File : BAB 1 - 151111011 - 151111045.pdf
(276493 bytes)
File : BAB 2 - 151111011 - 151111045.pdf
(605595 bytes)
File : BAB 5 - 151111011 - 151111045.pdf
(271544 bytes)