Perbandingan Metode Pelaksanaan Seri dan Parallel pada Proyek Pengembangan Masjid Raudhatul Hakim Villa Serpong

Comparison of Series And Parallel Implementation Method in The Project Development of Masjid Raudhatul Hakim Villa Serpong

Tugas Akhir, 016 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2019-07-22 14:43:03
Oleh : 151111018 - Moh. Dicky Faozan - 151111028 - Rivaldi Ahmad Muzakaroh (rvaldi.ahm@gmail.com)
Dibuat : 2019-07-22, dengan 4 file

Keyword : Comparison of Series, Parallel Implementation Method, Project Development, Masjid Raudhatul Hakim, Villa Serpong
Subjek : Perbandingan Metode, Pelaksanaan Seri, Parallel Pengembangan Masjid, Raudhatul Hakim, Villa Serpong

Pada dasarnya, sering kali bangunan gedung dirancang dan dilaksanakan menggunakan metode pelaksanaan konstruksinya secara seri, yaitu dengan langkah pelaksanaannya menyelesaikan pekerjaan struktur dari lantai dasar sampai paling atas, lalu menyelesaikan arsitekturnya.Namun selain itu, terdapat suatu urutan yang pelaksanaan konstruksinya yang menggunakan metode parallel, yaitu dengan langkah pelaksanaannya menyelesaikan pekerjaan struktur dengan struktur yang lain, arsitektur dengan arsitektur yang lain, ataupun mengerjakan pekerjaan struktur dengan arsitektur secara bersamaan. Selain dari urutan pelaksanaannya, metode konstruksi parallel ini dapat didukung dengan suatu teknologi pelaksanaan yang lebih canggih seperti pemakaian beton ready mix. Dalam penyelesaian kajian ini, dilakukan beberapa tahap pengerjaan yaitu menghitung volume pekerjaan untuk mengetahui berapa banyak kuantitas pekerjaan yang ditinjau.Lalu membuat WBS dari kedua metode untuk mendetailkan suatu pekerjaan menjadi komponen-komponen pekerjaan, kemudian dari komponen pekerjaan menjadi elemen-elemen pekerjaan.Kemudian menentukan AHS pekerjaan yang berkaitan dengan pekerjaan-pekerjaan yang ditinjau.Selanjutnya menentukan durasi pekerjaan dari kedua metode untuk mendapatkan jumlah waktu yang dibutuhkan untuk menyelesaikan suatu pekerjaan.Kemudian menentukan hubungan antar kegiatan dari kedua metode agar dalam setiap pekerjaan mempunyai hubungan logis dengan pekerjaan lainnya, baik itu pekerjaan sebelum maupun sesudah.Lalu mengidentifikasi jalur kritis dari kedua metode disetiap elemen pekerjaan untuk mengetahui seberapa banyak waktu tunggu yang dimiliki disetiap elemen pekerjaan.Dan yang terakhir adalah menentukan RAB dari kedua metode untuk mengetahui seberapa banyak biaya yang harus dikeluarkan. Dari hasil kajian Perbandingan Metode Pelaksanaan Seri dan Parallel pada Pengembangan Masjid Raudhatul Hakim didapatkan durasi pelaksanaan sebesar 413,58 hari dengan biaya total proyek sebesar Rp.4.642.618.960,00untuk metode seri dan durasi pelaksanaan sebesar 223,46 hari dengan biaya proyek sebesar Rp.4.421.629.682,00untuk metode parallel yang artinya penggunaan metode parallel lebih baik dibandingkan dengan metode seri dengan syarat pengawasan pada metode pelaksanaan parallel yang lebih ketat untuk mendapatkan hasil pelaksanaan yang lebih baik.

Deskripsi Alternatif :

Basically, building is often designed and executed using the method of implementation of the construction in series, ie with the implementation step completes the work of the structure from the ground floor to the very top, then finish the architecture. But besides that, there is a sequence that the implementation of the construction using parallel method, that is by step implementation completing the work structure with other structures, architectures with other architectures, or do the work of structures with the architecture simultaneously. Apart from the sequence of implementation, this parallel construction method can be supported by a more sophisticated implementation technology such as ready mix concrete usage. In completing this study, several stages of work are carried out, namely calculating the volume of work to find out how much quantity of work is being reviewed. Then make a WBS from both methods to detail a job into components of work, then from the work component to work elements. Then determine the AHS work related to the work being reviewed. Next determine the duration of the work of both methods to get the amount of time needed to complete a job. Then determine the relationship between activities of both methods so that in each job has a logical relationship with other work, both before and after work. Then identify the critical paths of the two methods in each work element to find out how much waiting time each element has. And the last is to determine the RAB from both methods to find out how much the costs must be incurred. From the results of the Comparative Study of Series and Parallel Implementation Methods on the Development of the Raudhatul Hakim Mosque, the duration of implementation was 413.58 days with the total project cost of Rp.4.642.618.960,00 for the series method and the duration of the implementation of 223.46 days with a project cost of Rp.4.421.629.682,00for parallel methods which means that the use of parallel methods is better than the serial method with the requirement of supervision on parallel implementation methods that are more stringent to get better results.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing : Ir. RR. Elisabeth Marlailana, M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...