Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018

Perancangan Pondasi pada Proyek Pembangunan Gedung Perkuliahan Poltekes Bogor

Foundation Design on Poltekes Bogor Lecture Building Construction Project

Tugas Akhir, 019 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2019-07-22 15:08:19
Oleh : 151111021 - Muhammad Iqbal Tawakkal - 151111047 - Muhamad Ilham Ramadhan (muhammad.iqbal.tkgd15@polban.ac.id)
Dibuat : 2019-07-22, dengan 4 file

Keyword : Foundation Design, Poltekes Bogor, Lecture Building Construction Project
Subjek : Perancangan Pondas, Proyek Pembangunan Gedung Perkuliahan, Poltekes Bogor

Gedung yang luas atau bertingkat tinggi umumnya menggunakan pondasi dalam untuk digunakan untuk menyalurkan beban bangunan ke lapisan tanah keras yang cukup dalam. Perencanaan pondasi dalam harus dilakukan dengan baik dan seteliti mungkin. Seluruh pondasi harus mampu memikul beban yang bekerja serta meminimalisir adanya perpindahan hingga batas yang telah ditentukan. Tugas akhir ini mengambil studi kasus pembangunan Gedung Perkuliahan POLTEKES Bogor, dimana struktur bawahnya menggunakan pondasi tiang pancang berjenis Mini Pile. Pada tugas akhir ini, data yang digunakan adalah data sondir yang digunakan untuk mencari daya dukung tiang tunggal. Pada pembebanan, digunakan data rekam gempa sesuai dengan percepatan puncak batuan (PGA) di lokasi penelitian yaitu 0.58 g. analisis pembebanan menggunakan aplikasi SAP2000 untuk mendapatkan beban aksial dan lateral yang bekerja pada bangunan. Tujuan dari tugas akhir ini adalah untuk menganalisis daya dukung tiang, pergeseran kepala tiang, penurunan yang terjadi pada pondasi dan penulangan untuk Pile Cap. Analisis dilakukan secara manual dengan penggunakan metode dari beberapa ahli lalu dikelompokan menggunakan MS. Excel, dan analisis secara numeris menggunakan software SAP2000 untuk mendapatkan reaksi kolom dari bangunan tersebut. Dari hasil perhitungan tiang pancang tunggal diperoleh nilai kapasitas daya dukung aksial sebesar 68400 kg. Penurunan total tiang grup sebesar 0.637 cm pada P1, 0.966 cm pada P2, dan 1.01 cm pada P4. Perpindahan terbesar pada P4 sebesar 0,0038 m arah x, 0,0265 m arah y, 0,0005 rad torsi terhadap sumbu X-X, 0,0066 m arah x, 0,0026 m arah y, 0,0012 rad torsi terhadap sumbu Y-Y. Semakin besar beban yang bekerja maka perpindahan dan penurunan yang terjadi akan semakin besar.

Deskripsi Alternatif :

Large or high-rise building generally use a deep foundation as a bottom structure which is used to deliver loads to deep layers of hard soil. Deep foundations planning should be as good and thorough as possible. The entire foundation must be able to carry the loads and minimize the movement according to a predetermined limit. This final project takes the case study of building of POLTEKES Bogor lecture building, which for bottom structure using Mini Pile type pile foundation. In this final project, the used data is sounding test data which is used to find the bearing capacity of single pile. For a load calculation, we’re using earthquake record data in accordance with peak ground acceleration (PGA) at the research location is 0.58 g. load analysis using SAP2000 applications to obtain axial and lateral loads working on building structures. The purpose of this final project is to analyze the bearing capacity of the pile, displacement of the pile, the settlement that occurs in pile foundation and reinforcement bar for Pile Cap. The analysis is calculated manually by using the method from some experts and then grouped using MS. Excel, and then numerical analysis using SAP2000 software to get the column reaction from the building. From the manual calculation, a single pile obtained the value of axial capacity of 68400 kg. The total settlement of group pile is 0.637 cm on P1, 0.966 cm on the P2, 1.01 cm on the type P4. The maximum displacement are 0,0038 m direction x, 0.0265 m y direction, 0.0005 rad torque against X-X axis, 0.0066 m direction x, 0.0026 m y direction, 0.0012 rad torque against Y-Y axis on P4 type foundation. The bigger the load that works then the displacement and the settlement that occurs will be greater.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. Geni Firuliadhim, M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...