Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018
Metode Kerja dan Rencana Anggaran Biaya Perkuatan Struktur Balok Dengan Cfrp pada Proyek Lanjutan Gedung C RSUD Cibabat Cimahi
Work Method and Budget Plan of Reinforced Structural Beam with CFRP in Continued Building C Project RSUD Cibabat Cimahi
Tugas Akhir, 022 / 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2019-08-01 13:58:55
Oleh : 151111025 - Naufal Al Hafidz Rizal - 151111055 - Riri Elvira Prilian (naufalalhafidzx1@gmail.com)
Dibuat : 2019-08-01, dengan 4 file
Keyword : beam, reinforcement, CFRP, RAB.
Subjek : balok, perkuatan, CFRP, RAB.
Proyek Lanjutan Gedung C RSUD Cibabat Cimahi merupakan Proyek peningkatan kembali gedung yang semula hanya terdiri dari dua lantai menjadi enam lantai. Penambahan lantai pada gedung mengakibatkan elemen struktur perlu kapasitas dalam menahan momen yang lebih besar dari semula, sehingga diberi perkuatan struktur menggunakan lapisan CFRP. Struktur yang ditinjau pada Tugas Akhir ini adalah balok. Nilai persentase kenaikan kapasitas balok didapatkan dengan dua metode, yakni metode hitungan teoritis yang mengacu pada aturan standar ACI 440.2R-08 chapter 15-Design Example, page 41 dan metode uji kuat lentur balok skala Laboratorium. Metode uji kuat lentur dilakukan terhadap balok tanpa perkuatan dan balok dengan lapisan perkuatan sebanyak satu sampai tiga lapis. Aspek yang ditinjau pada uji kuat lentur adalah persentase nilai kenaikan kapasitas balok uji (ÃM_n). Persentase nilai kenaikan kapasitas balok digunakan untuk menentukan volume kebutuhan CFRP. Biaya perkerjaan perkuatan pada Proyek dianalisis menggunakan metode perhitungan RAB, dengan nilai AHS pemasangan CFRP didapatkan dari metode kerja perkuatan struktur balok skala Laboratorium dan survey harga lapangan. Persentase nilai kenaikan kapasitas tambahan dari CFRP berdasarkan hitungan teoritis berturut-turut adalah sebesar 19,75% pada satu lapis perkuatan, 34,35% pada dua lapis perkuatan, dan 48,94% pada tiga lapis perkuatan, sedangkan berdasarkan uji kuat lentur balok skala Laboratorium kenaikannya adalah sebesar 6,5% pada satu lapis perkuatan, 4,8% pada dua lapis perkuatan, dan 0,6% pada tiga lapis perkuatan. Data hasil pengujian tidak dapat digunakan karena kenaikan kapasitas balok hanya terjadi pada satu lapis CFRP, sehingga perhitungan kebutuhan CFRP dihitung dengan cara teoritis. Total biaya perkuatan struktur balok pada Proyek Lanjutan Gedung C adalah senilai Rp 71.195.100,00.
Deskripsi Alternatif :The Advanced Project of Building C of Cibabat Cimahi Hospital is a rebuilding project which originally only consisted of two floors into six floors. The addition of the floor to the building resulted in the structural element needing capacity in holding the moment that was larger than the original, so that it was given structural reinforcement using the CFRP layer. The structure reviewed in this Final Project is a beam. The percentage value of the increase in beam capacity is obtained by two methods, namely the theoretical calculation method which refers to the ACI standard rules 440.2R-08 chapter 15-Design Example, page 41 and the laboratory scale beam beam flexural strength test method. The flexural strength test method is carried out on unreinforced beams and beams with reinforcement layers of one to three layers. Aspects reviewed in the flexural strength test is the percentage value of the increase in the capacity of the test beam (ÃM_n). The percentage value of the increase in beam capacity is used to determine the volume of CFRP needs. The cost of retrofitting on the Project was analyzed using the RAB calculation method, with the AHS value of CFRP installation obtained from the work method of laboratory scale beam structure strengthening and field price survey. Percentage value of additional capacity increase from CFRP based on theoretical calculations respectively is 19.75% in one layer of reinforcement, 34.35% in two layers of reinforcement, and 48.94% in three layers of reinforcement, while based on the test of flexural strength of the scale beam The laboratory increase was 6.5% in one layer of reinforcement, 4.8% in two layers of reinforcement, and 0.6% in three layers of reinforcement. Test results data cannot be used because the increase in beam capacity only occurs in one CFRP layer, so the calculation of CFRP requirements is calculated in a theoretical way. The total cost of beam structure reinforcement in the Building C Advanced Project is worth Rp. 71,195,100.00
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Yulianto P.K., M.M.
Pembimbing 2: Ujang Ruslan, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 151111025 - 151111055.pdf
(1326803 bytes)
File : BAB 1 - 151111025 - 151111055.pdf
(601217 bytes)
File : BAB 2 - 151111025 - 151111055.pdf
(452234 bytes)
File : BAB 5 - 151111025 - 151111055.pdf
(210351 bytes)