Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018

Perbandingan Pelaksanaan Pekerjaan Dinding Bata Merah dan Dinding Bata Ringan pada Proyek Perluasan Hotel de JAVA Bandung

The Comparison Work Implementation of Brick Wall and Light Brick Wall in de JAVA Hotel Bandung Expansion Project

Tugas Akhir, 023 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2019-08-01 14:13:21
Oleh : 151111026 - Niar Indrawati - 151111027 - Oryza Sativa (niar_indrawati@yahoo.com)
Dibuat : 2019-08-01, dengan 4 file

Keyword : Walls, Red bricks, Lightweight brick, Stopwatch time study, Methode, Productivity, Cost.
Subjek : Dinding, Bata merah, Bata ringan, Stopwatch time study, Metode, Produktivitas, Biaya.

Pada saat ini, produsen material bahan bangunan menciptakan berbagai inovasi dengan membuat material bangunan baru yang bertujuan untuk mempercepat proses pelaksanaan suatu konstruksi. Salah satu elemen utama pada bangunan gedung yang telah dikembangkan adalah dinding bata merah yang mulai digantikan peranannya oleh dinding bata ringan karena dinilai lebih cepat dalam pelaksanaannya. Maka dari itu, diperlukan analisa dalam segi pelaksanaan, produktivitas serta biaya untuk membuktikan apakah pemilihan material bata ringan untuk menggantikan bata merah sebagai material utama pembuatan dinding efektif ataukah tidak. Penelitian dilakukan pada Proyek Perluasan Hotel de JAVA Bandung, yang terdiri dari enam lantai dan satu lantai basement. Metode yang digunakan untuk memperoleh waktu pelaksaan menggunakan metode stopwatch time study. Hasil pembahasan yang diperoleh produktivitas pemasangan dinding bata merah yaitu 0,2 m2/jam dengan biaya pelaksanaan 1 m2-nya yaitu Rp 271.675,- sedangkan produktivitas pemasangan dinding bata ringan yaitu 0,3 m2/jam dengan biaya pelaksanaan 1 m2-nya yaitu Rp 460.396,-.

Deskripsi Alternatif :

n this time, manufacturers of building materials create various innovations by creating new building materials that aims to accelerate the process of implementation of a construction. One of the main elements in the building that has been developed is a red brick wall that began to be replaced by light brick wall because it is considered faster in its implementation. Therefore, it is necessary to analyze in terms of implementation, productivity and cost to prove whether the selection of lightweight brick material to replace the red brick as the main wall making material effective or not. The research was carried out at Hotel Extension Project de JAVA Bandung, consisting of six floors and one basement floor. The method used to obtain time of execution using stopwatch time study method. Results of the discussion obtained among others productivity of brick wall mounting that is 0,2 m2 / hour with implementation cost 1 m2 that is Rp 271.675,- while productivity of brick wall installation that is 0,3 m2 / hour with implementation cost 1 m2 that is Rp 460.396,-.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing : Muchtar, S.ST., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...