Perbandingan Analisa Biaya dan Penjadwalan Pelaksanaan Struktur Gedung menggunakan Bekisting Konvensional dengan Formwork System (S-Form) pada Proyek Apartemen Chadstone Cikarang
Comparison of Cost Analysis and Scheduling of Building Structure using Conventional Bekisting with Formwork System (S-Form) in Chadstone Cikarang Apartment Project
Tugas Akhir, 027/ 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2019-08-01 14:40:18
Oleh : 151111037 - Asrie Andarini Agustin - 151111054 - Ratna Nur Ihfada (asrie.andarini.tkgd15@polban.ac.id)
Dibuat : 2019-08-01, dengan 4 file
Keyword : scaffold reference, conventional formwork, formwork system (S-FORM)
Subjek : acuan perancah, bekisting konvensional, formwork system (S-FORM)
Tujuan dalam penulisan tugas akhir ini adalah membandingkan dan menganalisa biaya penggunaan acuan dan perancah berdasarkan jumlah tingkat kebutuhan acuan perancah antara bekisting konvensional dengan formwork system (S-FORM), serta membuat penjadwalan pelaksanaan acuan dan perancah S-FORM berdasarkan siklus pengecoran lantai. Metode yang digunakan untuk menyusun tugas akhir ini adalah metode survei dan metode observasi. Selain itu, terdapat data yang diperoleh seperti, shop drawing Proyek Apartemen Chadstone Cikarang, harga kontrak pekerjaan bekisting S-FORM, jadwal pengecoran, dokumentasi bekisting S-FORM, serta harga satuan elemen bekisting S-FORM. Hasil yang didapatkan dari tugas akhir ini adalah rekapitulasi anggaran biaya untuk bekisting konvensional 3 tingkat adalah sebesar Rp. 14.157.000.000,00, sedangkan untuk bekisting S-FORM 3 tingkat adalah sebesar Rp. 3.710.000.000,00. Dari kedua hasil tersebut dapat diresumekan bahwa biaya antara pekerjaan bekisting konvensional lebih mahal dibandingkan dengan formwork system S-FORM dengan rasio perbandingan sebesar 4:1. Dan berdasarkan metode pelaksanaan, bekisting S-FORM memiliki durasi penyelesaikan pekerjaan jauh lebih cepat dibanding dengan metode pelaksanaan bekisting konvensional dengan rasio perbandingan 1:3.
Deskripsi Alternatif :The purpose of combining these tasks is to compare and use costs based on performance standards with formwork systems (S-FORM), and make scheduling of S-FORM reference and scaffolding based on the floor casting cycle. The method used to conduct this research is survey method and method. In addition, there are data obtained such as, picture shop Chadstone Apartment Project Cikarang, contract formwork S-FORM, foundry schedule, filling S-FORM formwork, and the price of S-FORM formwork unit. The result of this final project is budget cost recapitulation for conventional formwork 3 level is Rp. 12.117.000.000,00, while for formwork S-FORM 3 level is Rp. 3.882.000.000,00. From these two results it can be concluded that the cost of formwork is more expensive compared to the S-FORM formwork system with comparison ratio 4:1. And based on the method of implementation, formwork S-FORM has the duration of completion of the work much faster with conventional defensive defender methods with comparison ratio 1:3.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing : Ujang Ruslan, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 15111037 - 15111054.pdf
(795036 bytes)
File : BAB 1 - 15111037 - 15111054.pdf
(352432 bytes)
File : BAB 2 - 15111037 - 15111054.pdf
(1113506 bytes)
File : BAB 5 - 15111037 - 15111054.pdf
(307468 bytes)