Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018

Analisa Daya Dukung Ijin Tiang Akibat Perubahan Konfigurasi Grup Tiang pada Gedung Perkantoran 5 Lantai, Jalan H. Hasan No.1 Bandung

Analysis of The Allowable Capacity of Pile Due To Changes In The configuration of Pile Groups in Office Building 5 Floors, Jalan H. Hasan Numb.1 Bandung

Tugas Akhir, 031 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2019-10-11 10:20:48
Oleh : 151111041 - Finkan Fajri Septiyoana - 151111046 - Mita Mayatria (mitamayatria04@gmail.com)
Dibuat : 2019-10-11, dengan 4 file

Keyword : Configuration pile, allowable capacity, pile, bored pile, office building.
Subjek : Konfigurasi pondasi, daya dukung, tiang pancang, bored pile, gedung perkantoran.

Pondasi merupakan konstruksi bangunan yang berfungsi sebagai penopang bangunan yang berada di atasnya serta penyalur beban dari struktur atas ke lapisan tanah yang berada di bagian bawahnya tanpa mengakibatkan keruntuhan geser tanah dan penurunan tanah yang berlebihan. Dalam pelaksanaannya, mungkin saja dapat terjadi masalah mengenai pelaksanaan teknis maupun non teknis di luar dugaan yang tidak sesuai dengan rencana, sama halnya seperti yang terjadi pada pembangunan Gedung Perkantoran 5 Lantai di Jl. H. Hasan no. 1 Bandung. Proyek ini terdiri dari 5 lantai yang berfungsi sebagai gedung perkantoran dengan tiang pancang sebagai pondasinya. Masalah yang terjadi yaitu terdapat perubahan konfigurasi pondasi pada titik 54 as A4, 55 as B4, 100 as B6 dan 101 as C6 dikarenakan nilai daya dukung ijin tiang tunggal hasil PDA test lebih kecil dari pada nilai daya dukung ijin rencana yang telah dihitung. Perubahan tersebut megakibatkan dilakukannya penambahan tiang baru berupa tiang bored pile pada titik grup tiang yang bermasalah dengan tujuan memperbesar daya dukung grup tiang untuk dapat menahan beban dari struktur atas bangunan dengan baik. Sehingga harus dilakukan kembali perhitungan pondasi menggunakan data laboratorium maupun data hasil soil investigation. Perhitungan ulang telah dilakukan dan didapatkan hasil mengenai daya dukung ijin tiang tunggal menurut data hasil pengujian lapangan (SPT) dan data hasil pengujian laboratorium dengan beberapa metode menurut para ahli seperti metode Terzaghi dan Peck, metode Mayerhoff serta metode Tomlinson dan API (American Petroleum Institute). Selanjutnya adalah didapat hasil dari nilai efisiensi grup tiang, daya dukung ijin grup tiang, penurunan tiang tunggal dan grup tiang, serta kebutuhan penulangan pada bored pile dan pile cap.

Deskripsi Alternatif :

The foundation is a building construction with the function as a support for the building above it as well as the load distributor from the upper structure to the bottom layer of soil without causing the shear collapse and excessive soil degradation, in this case is called the settlement. In its implementation, there may be unexpected problems regarding technical and non-technical implementation that are not in accordance with the plan, as is the case with the construction of the 5th Floor Office Building on Jl. H. Hasan no. 1 Bandung. This project consists of 5 floors which function as office buildings with piles as the foundation. Problems that occur are there are changes in the configuration of the foundation at points 54 as A4, 55 as B4, 100 as B6 and 101 as C6 because the value of the allowable capacity of the single pile permit results of the PDA test is smaller than the allowable capacity of the calculated plan permission. The change resulted in the addition of new piles in the form of bored pile at the point of the pile groups that have problems with the aim of increasing the allowable capacity of the pile groups to be able to withstand the load from the structure of the building well. So the calculation of the foundation must be done again using file Standard Penetration Test (SPT) and laboratory file testing results. Recalculation has been carried out and obtained results regarding the carrying capacity of a single mast according to the results of field testing (SPT) and the results of laboratory testing with several methods according to experts such as Terzaghi and Peck methods, Mayerhoff method and Tomlinson and API (American Petroleum Institute) methods. . Furthermore, the results obtained from the value of the pole group efficiency, the support capacity of the pole group, the reduction of single pole and pole group, and the need for reinforcement in bored pile and pile cap.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Hendry, Dip.Ing.H.T.L., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...