Metode Pelaksanaan, Rencana Anggaran Biaya, dan Penjadwalan Proyek Indekos dan Kafe Jalan Unjani/Kp. Rancacangkuang Cimahi

Implementation Methods, Cost Budget Plans, and Scheduling of Homestay and Cafe Jalan Unjani/Kp. Rancacangkuang Cimahi Building Project

Tugas Akhir, 030 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2019-10-11 10:16:37
Oleh : 151111052 - Nila Ratna Wulan - 151111057 - Rossaline Almasri (syifaaafn@gmail.com)
Dibuat : 2019-10-11, dengan 4 file

Keyword : Implementation Method, Cost Budget Plans, Scheduling, Microsoft Project.
Subjek : Metode Pelaksanaan, RAB, Penjadwalan, Microsoft Project.

Pelaksanaan sebuah proyek membutuhkan beberapa data sebagai penunjang agar suatu proyek dapat berjalan dengan baik. Pada proyek Indekos dan Kafe Jalan Unjani/Kp. Rancacangkuang Cimahi merupakan salah satu proyek yang mengalami hambatan dikarenakan kurangnya beberapa data sebab proyek tersebut tidak memiliki konsultan perencana, sehingga tugas akhir ini bertujuan untuk membuat gambar kerja detail, metode pelaksanaan, Rancangan Anggaran Biaya (RAB) dan penjadwalan. Metode untuk penyusunan tugas akhir ini diawali dengan membuat gambar kerja detail yang merupakan data penunjang untuk pengerjaan yang lainnya, menyusun Work Breakdown Structure (WBS), membuat metode pelaksanaan, menghitung Rencana Anggaran Biaya (RAB), dan membuat penjadwalan berupa barchart, net work planning, dan kurva S menggunakan Microsoft Project. Gambar yang dihasilkan meliputi gambar arsitektur, gambar struktur, dan gambar mekanikal dan elektrikal. Metode pelaksanaan pada proyek ini menggunakan struktur beton bertulang pada bangunan indekos dan struktur baja serta panel precast Eco Lite pada bangunan kafe. Berdasarkan perhitungan, besar rencana anggaran biaya didapatkan senilai Rp3.318.369.340 dengan durasi proyek selama 277 hari kerja.

Deskripsi Alternatif :

Implementation of a project requires some data as a support so that project can run well. The project of Homestay and Cafe Jalan Unjani/Kp.Rancacangkuang Cimahi is one of the project that exprerience obstacles due to lack of some data because the project does not have a planning consultant, so that the final project aims to make detailed work drawings, implementation methods, cost budgeting, and scheduling plan. The method for preparation of this final project begins with making detail work drawings which are supporting data for other work, compile Work Breakdown Structure (WBS), make implementation methods, calculate cost budget plans, and make scheduling in the form of barchart, net work planning, and curve S use Microsoft Project. The resulting image includes architectural drawings, structural drawings, and mekanikal and electrical images. The implementation method in this project uses reinforced concrete structures in boarding and steel structures as well as Eco Lite Precast Panel in Cafe building. Based of the calculation, a large budget plan is optained at Rp3.318.369.340 with a project duration of 277 working days.

Beri Komentar ?#(3) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ery Radya Juarti, S.T., M.T.

    Pembimbing 2: Drs. Husnul Fikri, S.T., M.T., Editor: Muhammad Abdillah Islamy, S.Pd

Download...