Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Elektro > Program Studi Teknik Elektronika > 2020

Sistem Penertiban Pemakaian Listrik untuk kWh Meter Pascabayar Jarak Jauh dengan Media Komunikasi Power Line Carrier Berbasis Mikrokontroler

Long Distance Electricity Control System for Post-Paid kWh Meter with Power Line Carrier Communication Media based Microcontroller

Tugas Akhir, 049 / 2020 / TEL
Undergraduate Theses from JBPTPPOLBAN / 2021-05-20 09:35:06
Oleh : 171311059 - Nanjar Syabanul Fajar (nanjarfajar@gmail.com)
Dibuat : 2021-05-20, dengan 4 file

Keyword : PLN losses, electricity cut off sanctions, conflicts, long-distance disconnection, power line carrier.
Subjek : Kerugian PLN, Sanksi pemutusan listrik, Konflik, Pemutusan jarak jauh, Power line carrier.

Penunggakan tagihan listrik membuat PLN mengalami kerugian besar. Pelanggan yang menunggak akan diberikan sanksi berupa pemutusan listrik kWh meter. Pemutusan listrik secara langsung sering menimbulkan konflik antara petugas PLN dan penunggak. Solusi untuk mengatasi permasalahan tersebut yaitu harus ada sistem pemutusan listrik tanpa adanya interaksi secara langsung. Tugas akhir ini bertujuan untuk merancang dan merealisasikan sistem yang dapat memutuskan listrik dari jarak jauh. Metode yang digunakan yaitu metode pemutusan listrik jarak jauh dengan media komunikasi Power Line Carrier. Hasil pengujian pada sistem ini telah berhasil terhadap 3 rumah dengan panjang konduktor yang terukur yaitu 310 meter, sehingga pelanggan dan petugas tidak akan terjadi interaksi secara langsung. Proses penertiban berhasil dilakukan pada jenis kWh meter analog dan digital. Alat pemutus kWh meter yang disabotase dapat diidentifikasi melalui pembacaan tegangan feedback. Hasil pengukuran delay pemutusan terhadap panjang konduktor berbanding lurus, semakin panjang konduktor yang digunakan maka delay pemutusan semakin besar. Nilai delay terkecil yang terukur yaitu 7,74 detik dengan panjang konduktor 5,9 meter, sedangkan nilai delay terbesar yang terukur yaitu 8,16 detik dengan panjang konduktor 310 meter.

Deskripsi Alternatif :

Electricity bill arrears cause PLN suffering huge losses. Customers who are in arrears will be given sanctions in the form of disconnection of the kWh meter electricity. Direct power cut often creates conflicts between PLN officers and arrears. The solution to overcome this problem is that there must be a power cut system without direct interaction. This final project aims to design and realize a system that can disconnect electricity from distance. The used method is the long-distance power cut method with the Power Line Carrier communication media. The test results on this system have been successful on 3 houses with the measured conductor length of 310 meters, so that customers and officers will not have direct interaction. The control process was successfully carried out on analog and digital kWh meter types. A sabotaged kWh meter breaker can be identified using a feedback voltage reading. The results of measuring the termination delay to the length of the conductor are directly proportional to the length of the conductor used, the greater the disconnection delay. The smallest measured delay value is 7.74 seconds with a conductor length of 5.9 meters, while the largest measured delay value is 8.16 seconds with a conductor length of 310 meters.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Sabar Pramono, BSEE., M.T.


    Pembimbing 2: Dini Rahmawati, S.ST., M.Sc., Editor: Muhammad Abdillah Islamy, S.Pd

Download...