Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2023
Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Off-Grid Untuk Suplai Daya Listrik Masjid Agung Kabupaten Tasikmalaya
Undergraduate Theses from JBPTPPOLBAN / 2024-03-19 14:32:42
Oleh : 181724021 - Nizar Sohib Akbar (nizar.sohib.tptl18@polban.ac.id)
Dibuat : 2024-03-19, dengan 4 file
Keyword : Energi Baru Terbarukan, Energi Surya, PLTS
Subjek : Renewable Energy, Solar Energy, NPV, Payback Period
Potensi Energi Surya di Indonesia baru saja termanfaatkan 0,1 GWp (0,02%) dari potensi sekitar 207 GWp. Maka dari itu, pada penelitian ini akan dibahas mengenai Perancangan Pembangkit Listrik Tenaga Surya (Plts) Off-Grid Untuk Suplai Daya Listrik Masjid Agung Kabupaten Tasikmalaya. Lokasi perencanaan ini dinilai memiliki potensi radiasi matahari yang cukup baik dengan angka radiasi 1691,5 KWh/m2. Perancangan ini dilakukan dengan cara mencari data meteorologi dari meteonorm 8.03, lokasi strategis peletakkan modul surya, kapasitas modul surya, kapasitas inverter, banyaknya modul, kapasitas Solar Charger Controller, kapasitas baterai, serta jumlah energi listrik yang dibutuhkan. Hasil perhitungan didapatkan dari 31,97 kWp modul surya yang terpasang. Dari aspek analisis ekonomi, dengan simulasi 25 tahun umur pembangkit didapatkan nilai NPV (Net Present Value) sebesar Rp.369,712,745, nilai ROI (Return on Investment) 52,1%, dan PP (Payback Periode) pada tahun ke-17 lebih 11 bulan yang menunjukan bahwa investasi untuk PLTS atap ini, menguntungkan dan layak untuk dilaksanakan. Kata Kunci: Energi Baru Terbarukan, Energi Surya, PLTS.
Deskripsi Alternatif :Solar energy potential in Indonesia has just been utilized at 0.1 GWp (0.02%) of a potential of around 207 GWp. Therefore, this research will discuss the Design of Off-Grid solar power plants (Plts) for the Electrical Power Supply of the Great Mosque of Tasikmalaya Regency. This planning location is considered to have good solar radiation potential, with a radiation rate of 1691.5 KWh/m2. This design was carried out by searching for meteorological data from Meteonorm 8.03: strategic locations for placing solar modules, solar module capacity, inverter capacity, number of modules, Solar Charger Controller capacity, battery capacity, and the amount of electrical energy needed. The calculation results are obtained from the 31.97 kWp of the installed solar module. From the aspect of economic analysis, with a simulation of 25 years of plant life, the NPV (Net Present Value) value is Rp. 369,712,745, the ROI (Return on Investment) value is 52.1%, and the PP (Payback Period) in the 17th year is more than 11 months, which shows that the investment for this rooftop PLTS is profitable and feasible to implement. Keywords: Renewable Energy, Solar Energy, NPV, Payback Period.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Dr. Drs. Ignatius Riyadi Mardiyanto, M.T.
Pembimbing 2: Ir. Sri Paryanto Mursid, M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 181724021.pdf
(1373293 bytes)
File : BAB 1 - 181724021.pdf
(386566 bytes)
File : BAB 2 - 181724021.pdf
(1200587 bytes)
File : BAB 5 - 181724021.pdf
(171439 bytes)