Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Perawatan & Perbaikan Gedung > 2023
Penilaian Keandalan Bangunan Untuk Optimalisasi Manajemen Operasional Bangunan Rusun Cingised Kota Bandung
Assessment Of Building Reliability for Optimization of Operational Management of Cingised Flats Buildings in Bandung City
Skripsi, 005 / 2023 / TPPGUndergraduate Theses from JBPTPPOLBAN / 2023-11-29 14:00:14
Oleh : 191144005 - Farhan Nuansa Putra & 191144028 - Victor Firstkiel Feber Naess (farhan.nuansa.tppg19@polban.ac.id ; victor.firstkiel.tppg19@polban.ac.id)
Dibuat : 2023-11-29, dengan 4 file
Keyword : Keandalan Bangunan, Standar Operasional Prosedur Pemeliharaan dan Perawatan Gedung
Subjek : Building Reliability, Standard Operating Procedures for Maintenance and Maintenance of Buildings
Gedung Rumah Susun Cingised merupakan hunian vertikal yang terdapat di daerah Bandung Timur, terdiri atas 5 blok dengan luas daerah ±22.529,29 m2 dan total unit mencapai 483 unit. Pada tugas akhir ini bangunan yang dijadikan sebagai objek penelitian hanya blok 4 saja. Gedung ini memiliki terdiri atas 5 lantai dengan luas total lantai 2842,45 m2 dan tinggi bangunan rata-rata 3 meter untuk setiap lantai. Gedung Rumah Susun Cingised yang telah beroperasi selama belasan tahun belum memiliki standar pemeliharaan dan perawatan gedung, untuk itu tugas akhir ini bertujuan untuk merencanakan perencanaan Standar Operasional Prosedur perbaikan, perawatan dan pemeliharaan dari komponen struktur dan arsitektur yang dinilai dari keandalan bangunan. Metode pemeriksaan keandalan dilakukan dengan 2 cara yaitu penilaian visual dan penilaian menggunakan bantuan alat Terrestrial Laser Scanner. Penilaian keandalan bangunan terdiri atas beberapa penilaian yaitu persyaratan tata bangunan, persyaratan keselamatan, persyaratan Kesehatan, persyaratan kenyamanan, persyaratan kemudahan. Berdasarkan hasil perhitungan nilai keandalan diperoleh nilai keandalan bangunan rusun cingised sebesar 68,08 % dan dinyatakan tidak andal. Kata kunci: Keandalan Bangunan, Standar Operasional Prosedur Pemeliharaan dan Perawatan Gedung.
Deskripsi Alternatif :The Cingised Flats Building is a vertical residence located in the East Bandung area, consisting of 5 blocks with an area of 22,529.29 m2 and a total of 483 units. In this final project, only block 4 of the building is used as a research object. This building consists of 5 floors with a total floor area of 2842.45 m2 and an average building height of 3 meters for each floor. The Cingised Flats building which has been operating for a dozen years does not yet have building maintenance and maintenance standards, for this reason this final project aims to plan a Standard Operating Procedure plan for repair, care and maintenance of structural and architectural components which are assessed from the reliability of the building. The reliability check method is carried out in 2 ways, namely visual assessment and assessment using the help of a Terrestrial Laser Scanner. The building reliability assessment consists of several assessments, namely building layout requirements, safety requirements, health requirements, comfort requirements, convenience requirements. Based on the results of the calculation of the reliability value, the reliability value of the cingised flat building was obtained at 68.08% and was declared unreliable. Keywords: Building Reliability, Standard Operating Procedures for Maintenance and Maintenance of Buildings.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Iman Ruchiat, SST., MST.
Pembimbing 2: Urwatul Wusqo, S.T., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 191144005 & 191144024.pdf
(1884940 bytes)
File : BAB 1 - 191144005 & 191144024.pdf
(734410 bytes)
File : BAB 2 - 191144005 & 191144024.pdf
(1141798 bytes)
File : BAB 5 - 191144005 & 191144024.pdf
(619628 bytes)